AJK | Engineering & Design - Services - AJK
8173
page,page-id-8173,page-child,parent-pageid-10703,page-template,page-template-full_width-php,ajax_fade,page_not_loaded,,,,wpb-js-composer js-comp-ver-4.1.2,vc_responsive
 
 

Stouvenel, Trent2 Trent Stouvenel
CAD Manager
LEED BD+C AP
NICET IV

leeds_logo

Isariya Duncan2Isariya Duncan
Electrical Engineer
CA# E 16221
LEED BD+C AP

Michael Stefun2Michael Stefun
Electrical Engineer
CA# E 20848

revit

Lucas Antoniak2Lucas Antoniak
BIM Manager

Jeang, Hu2Hu Jeang
L/V Design Engineer
NICET II

Engineering and Design

AJK&A’s engineering team is comprised of licensed electrical engineers and support personnel who have a vast background of experience in the electrical industry.

Whether designing a high rise or designing a fire alarm system for a child care center, AJK&A’s design group looks to serve AJK&A’s clients and their owners by designing a code compliant and cost effective system that will both meet their needs and fit within their budget.

AJK&A has experts in: electrical design and engineering, 2013 Title 24 Part 6 energy compliance, BIM, smoke control, fire alarm design, security design, voice/data, video monitoring, and much more.

Anthony Pisano2Anthony Pisano
L/V Design Engineer

Fuentes, Laurie2Laurie Fuentes
L/V CAD/BIM Operator

Brooks, Samuel2Samuel Brooks
CAD/BIM Operator

Kevin-Jessup Kevin Jessup
CAD Support Specialist

Hadzi-Pesic, Alen2Alen Hadzi-Pesic
CAD/BIM Operator

Prefab: Embracing the importance of pre-fab and BIM, A.J.
Kirkwood uses the latest Autodesk software (Revit/AutoCad/
Navisworks) to expedite installation and reduce rework.

BIM COORDINATION

Prefab: Embracing the importance of pre-fab and BIM, A.J.
Kirkwood uses the latest Autodesk software (Revit/AutoCad/
Navisworks) to expedite installation and reduce rework.

BIM COORDINATION

Threading the needle: Even with limited space, head
clearances, owner requirements, A.J. Kirkwood works
through these limitations to make it fit.

BIM COORDINATION

Threading the needle: Even with limited space, head
clearances, owner requirements, A.J. Kirkwood works
through these limitations to make it fit.

BIM COORDINATION

Attention to detail: From storage rooms to great rooms.

BIM COORDINATION

Attention to detail: From storage rooms to great rooms.

BIM COORDINATION

Installation: Working in conjunction with the BIM process, we use
the latest tools to stay ahead of the schedule.

BIM COORDINATION

Installation: Working in conjunction with the BIM process, we use
the latest tools to stay ahead of the schedule.

BIM COORDINATION

2013 Title 24, Part 6

This newly revised requirement has some people within the electrical industry in a state of confusion.  Our engineers are well versed in these new codes and have up-to-date training and resources to tackle these State requirements.  These skills allow AJK&A the ability to provide its customers with lighting control systems that keep the cost minimized, yet that can comply with all required acceptance testing. Where others fail, we succeed because we have the skill and dedication to conquer these new challenges.