Broadcasting and Mission Critical

 

The exclusive commonality of these projects is continuous power service; be it utility, on site generators, or UPS systems. The logistics of installing this type of equipment is paramount to a successful outcome. The (5) Coresite 2000 kW generators had to be stacked due to lack of space. The (2) Lodestar 1250 kW generators were very carefully transported over a less than 10’ wide road cut from a vertical mountain side. All work completed without a problem by AJK&A’s engineers, management and field crews.