top of page

Moss Adams - Irvine

The Moss Adams Irvine project involved a complete tenant improvement of the 7th floor within an active, fully operational multi-story commercial building. The floors directly above and below remained fully functional throughout the construction period, necessitating careful coordination and execution to minimize disruption to ongoing operations.


This 22,000 square foot space underwent a full remodel, retaining only the existing core areas: the elevator lobby, restrooms, and stairwell. A.J. Kirkwood & Associates, Inc. (AJK) was contracted to provide a comprehensive electrical and low-voltage package as part of the renovation.


AJK's scope of work included the installation of all-new, high-efficiency LED lighting fixtures and a state-of-the-art nLight lighting control system, ensuring energy efficiency and modern functionality. Additionally, the team provided complete low-voltage infrastructure, which included all voice and data cabling as well as cabling for room scheduling systems.


To support the updated layout and technology requirements, AJK installed 25 new poke-through floor boxes. This required precision coring into the existing floor slab and coordination with the occupied space below. Fire alarm systems were also upgraded, with AJK responsible for all conduit, devices, and wiring.

Location

Irvine, CA


Build Partners

DPR Construction

NBBJ


Size

22,000 sq. ft.


A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page