
CSUF - Visual Arts Complex
The California State University, Fullerton (CSUF) Visual Arts Complex underwent a comprehensive 110,000-square-foot modernization aimed at revitalizing Buildings A, B, C, and D. This extensive renovation addressed functional and building code deficiencies, resolved outdated programmatic elements, and significantly extended the facilities' life expectancy by an additional 50 years. Every aspect of the original structures was upgraded or replaced to support modern academic and creative needs. In addition, Building F was demolished to make way for a brand-new, two-story, 13,000-square-foot facility designed to house state-of-the-art technology and teaching spaces, enhancing the university’s ability to support contemporary arts education.
AJK was responsible for the complete installation of electrical and power systems, lighting, fire alarm system, telecommunications, and low-voltage systems throughout the complex. The scope also included audiovisual infrastructure and access control, ensuring that the upgraded and new buildings are equipped with advanced, integrated systems to support a dynamic and flexible learning environment.
Location
Fullerton, CA
Build Partners
C.W. Driver
HGA
Size
110,000 sq. ft.
Delivery Method
Design-Assist
Photos Courtesy of HGA




