top of page

Search Results

Search this site

252 results found with an empty search

  • Portfolio | A.J. Kirkwood

    < Back Parking Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Student Housing Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • CBU Event Center | Electrical Construction

    The new event center at Cal Baptist University was built to host athletic events, commencement exercises, orientation activities, and the university's chapel program. < Back CBU Event Center The new event center at Cal Baptist University was built to host athletic events, commencement exercises, orientation activities, and the university's chapel program. The 153,000 SF structure is the largest gathering space and seats more than 5,000 people with room to expand to just over 6,500. Location Riverside, CA Build Partners Sundt Construction SVA Architects Size 153,000 sq.ft. Delivery Method Design-Build Photos courtesy of Sundt Construction 1/7 Previous Next

  • UCLA - Center for Health Science | Electrical Construction

    The retrofit of the former hospital structure was divided into two phases to maintain existing operations of lower-level medical laboratories. < Back UCLA - Center for Health Science Designed to LEED Platinum Certification standards, the retrofit of the former hospital structure was divided into two phases to maintain existing operations of lower-level medical laboratories. The priority of the renovation into state-of-the-art research laboratories and offices was the building’s energy efficiency, life safety infrastructure, and seismic III rating sustainability throughout the facility. AJK provided power & lighting and new fire alarm system throughout the East, West, and Southeast wings, and Biomedical library. Location Los Angeles, CA Build Partners PCL Construction Zimmer Gunsul Frasca Archtects, LLP Size 874,800 sq.ft. Photo Courtesy of Paul Turang Photography/PCL 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back JW Marriott at LA Live Lobby Bar Renovation Previous Next

  • CSULB - Walter Pyramid | Electrical Construction

    Moving toward sustainability, CSULB updated the athletic and event center’s lighting with new energy-efficient lighting. < Back CSULB - Walter Pyramid Moving toward sustainability, CSULB updated the athletic and event center’s lighting with new energy-efficient lighting. The updating LED light system saves on energy consumption and also offers the school more advanced setting options. The upgraded lights utilize digital controls, dimmers, and changeable colored lights. Location Long Beach, CA Build Partners C.W. Driver Zimmer Gunsul Frasca Architects, LLP Size 39,000 sq.ft. 1/1 Previous Next

  • 888 Grand Hope Lofts | Electrical Construction

    The 888 Grand Hope Lofts, situated in downtown Los Angeles, is a 34-story residential high-rise project comprising 525 residential apartments and ground-floor retail space. < Back 888 Grand Hope Lofts The 888 Grand Hope Lofts, situated in downtown Los Angeles, is a Type 1-A 34-story residential high-rise project comprising 525 residential apartments and ground-floor retail space. The community boasts a penthouse clubhouse and a spacious 33,000 square-foot open-air amenity deck, connected to a 25-foot bridge that spans an existing 550-space parking structure. AJK played a pivotal role in this project by handling the installation of power systems, lighting, a 1000kW GenSet (generator set), the fire alarm system, security systems, and voice/data/TV infrastructure. Location Los Angeles, CA Build Partners Suffolk Construction RTKL Associates, Inc. Size 550,000 sq.ft. Delivery Method Design-Build 1/1 Previous Next

  • CSUDH - Innovation & Instruction Building | Electrical Construction

    The design for each space of the 4-story building focuses on creating an active collaborative learning/meeting environment. < Back CSUDH - Innovation & Instruction Building The steel-frame structure houses general university and business school classrooms, faculty/administration offices, an event center, and a café. The design for each space of the 4-story building focuses on creating an active collaborative learning/meeting environment. AJK installed power, lighting, voice/data, and DAS for this project. Location Carson, CA Build Partners C.W. Driver HGA Architects Size 108,000 sq.ft. CSUDH I&I.png CSUDH I&I.png 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back Sunrise Senior Living Long Beach Previous Next

  • Privacy Policies & Notices | A.J. Kirkwood

    Privacy Policies & Notices 1 AJK Employee Privacy Policy Online More Info 2 Applicant Privacy Notice Online More Info 3 Employee Privacy Policy Notice Online More Info

  • Security Systems | Electrical Construction

    SECURITY OUR GOAL IS TO PROVIDE SUPERIOR PROTECTION FOR YOUR BUILDING, ASSETS, AND PEOPLE We provide a range of solutions, from IP-based video and access to basic intrusion alarm systems. Our team is dedicated to working with you to identify the solution that fits your requirements. From design and construction to plans and specifications, we deliver a comprehensive solution that can transform how businesses function. SERVICES DESIGN, INSTALL, AND SERVICE: Access Control Systems Intrusion Detection Video surveillance Telephone Entry Systems SYSTEM PARTNERS

  • Harvest Christian Church Children's Ministry | Electrical Construction

    The Harvest Christian Church Children's Ministry campus is located in Riverside, CA. < Back Harvest Christian Church Children's Ministry The Harvest Christian Church Children's Ministry campus includes a 52,426 sq. ft. children's ministry building and a 24,997 sq. ft. multi-purpose building. The campus also includes a full basketball court, fellowship hall, children's classrooms and chapel, and administrative area. AJK installed power, lighting systems, fire alarm, voice/data, and AV system. Location Riverside, CA Build Partners Diffenbaugh Professional Constructors Kroh Architects Size 77,423 sq. ft. Delivery Method Design-Build 1/3 Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page