Search Results
Search this site
246 results found with an empty search
- Whittier Library | Electrical Construction
The Whittier Central Library remodel addressed mechanical, electrical, plumbing, and roofing issues. < Back Whittier Library The Whittier Central Library remodel addressed mechanical, electrical, plumbing, and roofing issues. It also added 5,211 square feet, including a one-story, 1,773 square-foot addition constructed in the location of the north patio and a two-story 2,938 square-foot addition with an adjacent new light well constructed in the location of the south patio. AJK provided power and installed the electrical, low voltage systems, and fire alarm system. Location Whittier, CA Build Partners C.W. Driver/CWA AIA Owner Whittier Library Size 41,338 sq.ft. 1/2 Previous Next
- CalTrans Maintenance Training Center | A.J. Kirkwood
PUBLIC WORKS CalTrans Maintenance Training Center
- Montecedro Senior Living Community | Electrical Construction
The Montecedro Senior Living Community redefines senior housing with its 132 independent living units, 20 memory care assisted living spaces, and 4 villa-style senior living accommodations. < Back Westmark Lower Campus AJ Kirkwood & Associates played a key role in the construction of Westmark Lower School, a groundbreaking net-zero carbon campus in Encino, California. Designed to support students with learning differences, the new lower school provides a safe, inclusive, and nature-focused environment that promotes creativity, engagement, and well-being. The project involved the new construction of four K–5 school buildings on an existing private K–12 campus. These buildings feature 10 classrooms with dedicated resource rooms, a multi-purpose theater with an ETC theatrical lighting system, sound booth, and rack-mounted lighting, as well as an instruction room, occupational therapy room, counselor office, and teacher's lounge. The campus also includes a playground, an exterior amphitheater, a new basketball court, a single elevator, and projector screens throughout. Infrastructure has been put in place to support future solar installations. AJK was responsible for the full electrical scope of the project, including the installation of all power and lighting systems. Additionally, our Low Voltage Division delivered comprehensive systems integration across the campus, including security, networked intercom, panic buttons, and synchronized networked clock systems. Westmark Lower School stands as a forward-thinking model of sustainability, innovation, and inclusivity in education, and AJK is proud to have been a part of bringing it to life. Location Encino, CA Build Partners Suffolk Construction nbbj Size 15,500 sq. ft DSC_0575.JPG DSC_0585.1.JPG DSC_0586.JPG DSC_0575.JPG 1/12 Previous Next
- La Marea Senior Living | Electrical Construction
The La Marea Senior Living development is a two-story split-level senior living community designed to accommodate a 24-Hour Residential Care Facility for the Elderly (RCFE). < Back Westmark Lower Campus AJ Kirkwood & Associates played a key role in the construction of Westmark Lower School, a groundbreaking net-zero carbon campus in Encino, California. Designed to support students with learning differences, the new lower school provides a safe, inclusive, and nature-focused environment that promotes creativity, engagement, and well-being. The project involved the new construction of four K–5 school buildings on an existing private K–12 campus. These buildings feature 10 classrooms with dedicated resource rooms, a multi-purpose theater with an ETC theatrical lighting system, sound booth, and rack-mounted lighting, as well as an instruction room, occupational therapy room, counselor office, and teacher's lounge. The campus also includes a playground, an exterior amphitheater, a new basketball court, a single elevator, and projector screens throughout. Infrastructure has been put in place to support future solar installations. AJK was responsible for the full electrical scope of the project, including the installation of all power and lighting systems. Additionally, our Low Voltage Division delivered comprehensive systems integration across the campus, including security, networked intercom, panic buttons, and synchronized networked clock systems. Westmark Lower School stands as a forward-thinking model of sustainability, innovation, and inclusivity in education, and AJK is proud to have been a part of bringing it to life. Location Encino, CA Build Partners Suffolk Construction nbbj Size 15,500 sq. ft DSC_0575.JPG DSC_0585.1.JPG DSC_0586.JPG DSC_0575.JPG 1/12 Previous Next
- Murietta Premiere Wellness & Rehab | Electrical Construction
The Ellison John Transitional Care Center is a skilled nursing facility, comprising 170 beds and has been meticulously designed to foster a supportive and compassionate environment conducive to healing, rejuvenation, and an enhanced quality of life. < Back Westmark Lower Campus AJ Kirkwood & Associates played a key role in the construction of Westmark Lower School, a groundbreaking net-zero carbon campus in Encino, California. Designed to support students with learning differences, the new lower school provides a safe, inclusive, and nature-focused environment that promotes creativity, engagement, and well-being. The project involved the new construction of four K–5 school buildings on an existing private K–12 campus. These buildings feature 10 classrooms with dedicated resource rooms, a multi-purpose theater with an ETC theatrical lighting system, sound booth, and rack-mounted lighting, as well as an instruction room, occupational therapy room, counselor office, and teacher's lounge. The campus also includes a playground, an exterior amphitheater, a new basketball court, a single elevator, and projector screens throughout. Infrastructure has been put in place to support future solar installations. AJK was responsible for the full electrical scope of the project, including the installation of all power and lighting systems. Additionally, our Low Voltage Division delivered comprehensive systems integration across the campus, including security, networked intercom, panic buttons, and synchronized networked clock systems. Westmark Lower School stands as a forward-thinking model of sustainability, innovation, and inclusivity in education, and AJK is proud to have been a part of bringing it to life. Location Encino, CA Build Partners Suffolk Construction nbbj Size 15,500 sq. ft DSC_0575.JPG DSC_0585.1.JPG DSC_0586.JPG DSC_0575.JPG 1/12 Previous Next
- Casa Dorinda | Electrical Construction
Casa Dorinda is a historic senior living community on 48 acres in Montecito and is the only senior retirement campus in the community. < Back Westmark Lower Campus AJ Kirkwood & Associates played a key role in the construction of Westmark Lower School, a groundbreaking net-zero carbon campus in Encino, California. Designed to support students with learning differences, the new lower school provides a safe, inclusive, and nature-focused environment that promotes creativity, engagement, and well-being. The project involved the new construction of four K–5 school buildings on an existing private K–12 campus. These buildings feature 10 classrooms with dedicated resource rooms, a multi-purpose theater with an ETC theatrical lighting system, sound booth, and rack-mounted lighting, as well as an instruction room, occupational therapy room, counselor office, and teacher's lounge. The campus also includes a playground, an exterior amphitheater, a new basketball court, a single elevator, and projector screens throughout. Infrastructure has been put in place to support future solar installations. AJK was responsible for the full electrical scope of the project, including the installation of all power and lighting systems. Additionally, our Low Voltage Division delivered comprehensive systems integration across the campus, including security, networked intercom, panic buttons, and synchronized networked clock systems. Westmark Lower School stands as a forward-thinking model of sustainability, innovation, and inclusivity in education, and AJK is proud to have been a part of bringing it to life. Location Encino, CA Build Partners Suffolk Construction nbbj Size 15,500 sq. ft DSC_0575.JPG DSC_0585.1.JPG DSC_0586.JPG DSC_0575.JPG 1/12 Previous Next






