top of page

Search Results

Search this site

252 results found with an empty search

  • Westmark Lower Campus | Electrical Construction

    Westmark Lower School, a groundbreaking net-zero carbon campus in Encino, California. < Back Westmark Lower Campus AJ Kirkwood & Associates played a key role in the construction of Westmark Lower School, a groundbreaking net-zero carbon campus in Encino, California. Designed to support students with learning differences, the new lower school provides a safe, inclusive, and nature-focused environment that promotes creativity, engagement, and well-being. The project involved the new construction of four K–5 school buildings on an existing private K–12 campus. These buildings feature 10 classrooms with dedicated resource rooms, a multi-purpose theater with an ETC theatrical lighting system, sound booth, and rack-mounted lighting, as well as an instruction room, occupational therapy room, counselor office, and teacher's lounge. The campus also includes a playground, an exterior amphitheater, a new basketball court, a single elevator, and projector screens throughout. Infrastructure has been put in place to support future solar installations. AJK was responsible for the full electrical scope of the project, including the installation of all power and lighting systems. Additionally, our Low Voltage Division delivered comprehensive systems integration across the campus, including security, networked intercom, panic buttons, and synchronized networked clock systems. Westmark Lower School stands as a forward-thinking model of sustainability, innovation, and inclusivity in education, and AJK is proud to have been a part of bringing it to life. Location Encino, CA Build Partners Suffolk Construction nbbj Size 15,500 sq. ft Awards 2024 ABC SoCal Excellence in Construction - Merit Award Winner DSC_0575.JPG DSC_0585.1.JPG DSC_0586.JPG DSC_0575.JPG 1/12 Previous Next

  • Mariner's Church Youth Building | Electrical Construction

    The Mariner’s Church’s master-planned project was developed in a series of phases. < Back Mariner's Church Youth Building The Mariner’s Church’s master-planned project was developed in a series of phases. Approximately 80% of the site has been improved or newly constructed from vacant land. The new youth center facility included the expansion of campus facilities from two existing buildings to seven major buildings, two auditoriums, offices, meeting areas, parking structures, and new outdoor facilities and playspace. The campus site setting was designed to accommodate special occasions, including weddings and other gatherings. AJK provided site electrical improvements including power & lighting, fire alarm system, voice/data, and audio/visual cabling. Location Irvine, CA Build Partners Oltmans Construction DeRevere & Associates Size 27,000 sq. ft. Delivery Method Design-Build Photo Courtesy of Sacks Del Mar 1/9 Previous Next

  • Meridian Newport Beach | Electrical Construction

    The Meridian is a luxury high-end condominium that features five 3 and 4-story Type II-B buildings constructed over a 1 and 2-story type I-A garage. < Back Meridian Newport Beach Located in Newport Beach at Fashion Island, the Meridian is a luxury high-end condominium that features five 3 and 4-story Type II-B buildings constructed over a 1 and 2-story type I-A garage. The development features a clubhouse, fitness center, golf course, a pool on grade, and stunning ocean views. AJK installed the fire alarm system, CCTV, and access control system. Location Newport Beach, CA Builder Abbeyside Construction / Bernard's MVE Studio Size 396,900 sq. ft. 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back Carmel Bundy Previous Next

  • Current Projects | Electrical Construction

    < Back Pomona College - CGE & LIRH Previous Next

  • Caltech - Shapiro Lab & Offices | Electrical Construction

    The first floor of Spalding Laboratories to was reconfigured to adequately serve the program requirements of the incoming professor, Mikhail Shapiro, Assistant Professor of Chemical Engineering at the California Institute of Technology. < Back Caltech - Shapiro Lab & Offices The project reconfigured the first floor of Spalding Laboratories to adequately serve the program requirements of the incoming professor, Mikhail Shapiro, Assistant Professor of Chemical Engineering at the California Institute of Technology. The project consisted of a research lab, offices for faculty and students, and support area. Location Pasadena, CA Build Partners Matt Construction CO Architects Size 3,300-sq.ft. Delivery Method Design Build 1/1 Previous Next

  • Prefabrication | Electrical Engineering & Construction

    PREFABRICATION PRE-PLAN - PREFAB - PERFORM Our 25, 000-square-foot prefabrication facility has a crew of 10 experienced full-time employees. AJK strives to improve project productivity, reduce project durations, reduce labor costs, and improve safety. PREFAB IS THE POWER TO PERFORMANCE QUALITY & EFFICIENCY Our prefab capabilities allow us to increase quality and efficiency while standardizing our product and reducing labor costs. We are constantly striving for more innovative prefabrication solutions to maximize value for our clients. Additionally, our facility has ample warehouse space for storing, organizing, and staging material. Brad Hanenberg Sr. Vice President Dan Ticorat Prefab Shop Manager

  • Safety & Education | A.J. Kirkwood

    Top of Page Safety Documents Continued Education SAFETY & EDUCATION Safety required information and upcoming education opportunities. Safety Data Sheets AJK SDS Heat Illness Prevention Program Heat Illness Electronic Labor Poster 2026 Labor Poster Injury & Illness Prevention Program IIPP Trench Permit 2025 Trench Permit OSHA 300A 2025 OSHA 300A CONTINUED EDUCATION At A.J. Kirkwood & Associates, we prioritize education and professional growth through hands-on, in-person training at our AJK facilities and contributions to ABC. While online training offers convenience, we believe in the value of face-to-face learning for better engagement, teamwork, and hands-on experience. ABC CE Schedule

  • Portfolio | A.J. Kirkwood

    < Back Libraries Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Current Projects | Electrical Construction

    < Back 18722 Sherman Previous Next

  • UCLA Nimoy Theater | Electrical Construction

    The UCLA Nimoy Theater project was a historic renovation to convert the historic Crest Theatre, first opened in 1940, into the Nimoy Theater for the University of California, Los Angeles (UCLA). < Back UCLA Nimoy Theater The UCLA Nimoy Theater renovation includes 150 permanent seats on risers and a flexible ground-floor seating area that can accommodate an additional 299 seats in various configurations. The restoration preserved many of the theater's original art deco-inspired features, such as the historic marquee, light fixtures, decorative columns, and wall-mounted interior decorative pylons. AJK handled all the lighting and electrical work for the project. Location Los Angeles, CA Build Partners Shawmut Design & Construction BAR Architects Size 10,595 sq. ft. Photo Courtesy of Shawmut Design & Construction 1/1 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Miscellaneous Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page