top of page

Search Results

Search this site

246 results found with an empty search

  • Hollywood Arts Collective | Electrical Construction

    Hollywood Arts Collective is a new 151-unit affordable housing complex located in Hollywood. < Back Hollywood Arts Collective The Hollywood Arts Collective is a recent addition to Hollywood's affordable housing options, featuring 151 residential units. This project involved the construction of a seven-story building, combining Type III over Type I construction methods. The building includes three levels of subterranean parking, accommodating up to 252 vehicles, along with 24 EV charging stations equipped with 6 Pay Stations. Additionally, the ground floor comprises 9,900 square feet of retail space. Noteworthy amenities provided within the complex encompass a welcoming lobby, a community room with a kitchen, a recording studio, office spaces, a fitness room, a laundry facility, and three courtyards. In terms of technical installations, AJK was responsible for the installation of power systems, lighting, LV conduit, fire alarm systems, and DAS (Distributed Antenna Systems). Location Los Angeles, CA Build Partners Benchmark Contractors, Inc. BSB Design Size 273,164 gross sq. ft. 1/22 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Historic Restoration Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Sunset La Cienega: Middle Parcel | Electrical Construction

    The Middle Parcel features two 8-story towers with 190 residential units, 55,000 s.f. of retail space, and an open-air plaza. < Back Sunset La Cienega: Middle Parcel The Sunset La Cienega project is positioned at the southeast and southwest corners of the Sunset Boulevard and La Cienega Boulevard intersection in West Hollywood. The Middle Parcel, encompassing 2.06 acres and located on the southwest corner of the intersection, hosts a development with a total of 292,000 gross square feet. This project comprises two eight-story residential towers featuring 190 residential units, ground-floor retail spaces, an open-air plaza, and underground parking facilities. AJK played a key role in this project, overseeing the installation of power systems, lighting, the fire alarm system, and the Distributed Antenna System (DAS). Location West Hollywood, CA Build Partners Suffolk Construction Skidmore, Owings & Merrill LLP Size 1,136,500 sq. ft. Delivery Method Design-Build 3D BIM Coordination 1/3 Previous Next

  • Current Projects | Electrical Construction

    < Back Pomona College - CGE & LIRH Previous Next

  • OCC - Kinesiology & Athletics Complex | Electrical Construction

    The new athletics center features state-of-the-art modernized training facilities, instructional spaces, and labs for the school’s physical education, athletics, sports medicine, and kinesiology programs. < Back OCC - Kinesiology & Athletics Complex Built in two phases, the new Orange Coast College athletics center features state-of-the-art modernized training facilities, instructional spaces, and labs for the school’s physical education, athletics, sports medicine, and kinesiology programs. Comprised of three buildings, the initial stage included the construction of a 58,000-sq.ft. multi-use building with competition and instructional pool deck while phase 2 included the renovation of the existing 30,000-sq.ft structure that housed the men’s and women’s locker room and pool areas. Location Costa Mesa, CA Build Partners C.W. Driver Little Size 88,000 sq.ft. Photo Courtsey of Little Diversified Architectural Consulting 1/1 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Healthcare Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Current Projects | Electrical Construction

    < Back The Marisol Huntington Beach Previous Next

  • The 1 Hotel | Electrical Construction

    Now known as the 1 Hotel, development encompasses two 10-story high-rise hotel towers offering a total of 286 hotel rooms, ground-floor retail spaces, a restaurant area, and three levels of underground parking. < Back The 1 Hotel The Sunset La Cienega project is situated at the southeast and southwest corners of the Sunset Boulevard and La Cienega Boulevard intersection in West Hollywood. The East parcel of Sunset La Cienega has been designated as The 1 Hotel. This site encompasses two 10-story high-rise hotel towers offering a total of 286 hotel rooms, ground-floor retail spaces, a restaurant area, and three levels of underground parking. Additionally, the parcel includes an open-air plaza that provides a panoramic view of the Los Angeles basin. AJK played a significant role in this project, overseeing the installation of power systems, lighting, the fire alarm system, and the Distributed Antenna System (DAS). Location West Hollywood, CA Build Partners Suffolk Construction SOM Size 1,136,500 sq. ft. Delivery Method Design-Build 1/2 Previous Next

  • Current Projects | Electrical Construction

    < Back Hollywood Bowl - Artist Pavilion Previous Next

  • CBU - West Chemistry Lab | Electrical Construction

    The construction of the new chemistry lab featured lab improvements, microbiology lab improvements, support rooms, restrooms, equipment, and fixtures. < Back CBU - West Chemistry Lab The James West Chemistry Lab at Cal Baptist University started with the demolition of classrooms, offices, restrooms, and finishes. The construction of the new chemistry lab featured lab improvements, microbiology lab improvements, support rooms, restrooms, equipment, and fixtures. Location Riverside, CA Build Partners Tovey/Schultz PCH Architects Size 5,580-sq. ft. Photo Courtesy of Tovey Schultz 1/1 Previous Next

  • CSULB - Walter Pyramid | Electrical Construction

    Moving toward sustainability, CSULB updated the athletic and event center’s lighting with new energy-efficient lighting. < Back CSULB - Walter Pyramid Moving toward sustainability, CSULB updated the athletic and event center’s lighting with new energy-efficient lighting. The updating LED light system saves on energy consumption and also offers the school more advanced setting options. The upgraded lights utilize digital controls, dimmers, and changeable colored lights. Location Long Beach, CA Build Partners C.W. Driver Zimmer Gunsul Frasca Architects, LLP Size 39,000 sq.ft. 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back 18722 Sherman Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page