top of page

Search Results

Search this site

252 results found with an empty search

  • Life Time Brea | Electrical Construction

    As part of the highly anticipated Brea Mall redevelopment, the new 85,000-square-foot Life Time Fitness is set to redefine the concept of a luxury athletic club. < Back Life Time Brea As part of the highly anticipated Brea Mall redevelopment, the new 85,000-square-foot Life Time Fitness is set to redefine the concept of a luxury athletic club. This resort-style facility will offer a wide range of premium amenities, including indoor and outdoor pickleball courts, a Beach Club complete with pools, and a poolside bistro, delivering a wellness-focused experience that goes far beyond a traditional gym. AJK is proud to deliver the complete electrical infrastructure for this custom-built project. Our scope includes the installation of a 2000-amp electrical service with four dedicated electrical rooms, a comprehensive Distributed Antenna System (DAS), and a state-of-the-art fire alarm system. We are also responsible for lighting throughout the facility - including extensive decorative lighting and integrated lighting controls - as well as power to support the club’s two pools, full commercial kitchen and bar, luxurious spa, and backup power systems including an inverter and UPS. Location Brea, CA Build Partners Whiting-Turner LT Archtecture, LLC Size 85,000 sq. ft. 1/12 Previous Next

  • Sand Canyon Plaza - Senior Living | Electrical Construction

    The Sand Canyon Plaza Senior Living project is a new, state-of-the-art development designed to serve the evolving needs of Santa Clarita’s aging population. < Back Sand Canyon Plaza - Senior Living The Sand Canyon Plaza Senior Living project is a new, state-of-the-art development designed to serve the evolving needs of Santa Clarita’s aging population. This three-story, 84,589-square-foot ground-up construction will provide 140 thoughtfully designed residential units and offer a full spectrum of senior care services, ranging from assisted living to specialized memory care. The facility aims to create a safe, supportive, and vibrant environment where residents can thrive with dignity and independence. AJK's scope of work includes full power distribution, general power, and interior/exterior lighting. We are also installing a backup generator system to ensure uninterrupted service for critical operations. In partnership with specialty contractors, AJK is coordinating the infrastructure for fire alarm, DAS, two-way communication, nurse call, and other low-voltage systems to ensure resident safety and facility efficiency. Location Santa Clarita, CA Build Partners Bernards Brothers, Inc. Erdman Size 84,589 sq. ft. https://www.youtube.com/watch?v=sS8KDONw75w https://www.youtube.com/watch?v=M8AkcP-ydRc DJI_20260501143007_0099_D-HDR.jpg 1/4 Previous Next

  • Atelier | Electrical Construction

    Centrally located in downtown Los Angeles, Atelier is a 35-story, 363 residential unit high-rise building that sits on 10,000 SF of retail space. < Back Atelier Centrally located in downtown Los Angeles, Atelier is a 35-story, 363 residential unit high-rise building that sits on 10,000 s.f. of retail space. The building features premium amenities including an expansive courtyard with a large resort-style pool, cabanas, a spa, green space, and a dog run. The fifth floor is the main amenity level, which includes an indoor/outdoor courtyard deck, a fitness center, a clubhouse, screening and private event rooms, a wi-Fi lounge, and a business center. The penthouse floor, located on the 34th floor, overlooks expansive views and features a rooftop deck and clubhouse. AJK provided a 1,000 kW GenSet and installed the fire alarm system, AV system, CCTV, and access control system. Location Los Angeles, CA Build Partners Carmel Partners Soloman Cordwell Buenz Size 611,200 sq. ft. Delivery Method Design-Build Atelier-3.jpg Atelier-2.jpg Atelier-1.jpg Atelier-3.jpg 1/3 Previous Next

  • Careers | Electrical Construction | Southern California

    CAREERS At A.J. Kirkwood & Associates, you’re not just joining a company, you’re building a career with long-term opportunity. Founded in 1996, AJK is a leading design-build electrical and special systems contractor serving Southern California. Over the past three decades, we’ve successfully delivered more than 1,000 projects across a wide range of industries, building a reputation for quality, reliability, and innovation. As a 100% employee-owned company, every team member has a stake in our success. That ownership mindset drives how we work, with accountability, collaboration, and pride in what we build. We invest in our people through mentorship, hands-on experience, and clear paths for growth. Whether you’re in the field or the office, you’ll be part of a team that supports each other, takes ownership, and is committed to doing the work the right way. At AJK, you’re more than an employee; you’re an owner, a contributor, and part of a company built to last. Current openings are managed through our secure hiring platform powered by BambooHR. When you click Apply for this Job, you'll complete your application through BambooHR. Information submitted during the application process is governed by both AJK's Privacy Policy and BambooHR's Privacy Policy.

  • A.J. Kirkwood Headquarters | Electrical Construction

    Originally the Beckman Coulter’s administrative building, the renovation featured improvements to the historic building. < Back A.J. Kirkwood Headquarters Originally the Beckman Coulter’s administrative building, the renovation featured improvements to the historic building including the upgrade of energy efficiency with LED lighting and smart controls throughout, a new roof and mechanical systems. The space includes the creation of new offices, breakrooms, conference rooms, and gathering space. Location Fullerton, CA Build Partners Oltmans Construction Co. Bastien and Associates, Inc. Size 43,000 sq.ft. Delivery Method Design-Build 1/11 Previous Next

  • Palisades Charter High School - Temporary Relocation | Electrical Construction

    The Palisades HS Relocation project was a fast-tracked conversion of a vacant building into a fully functioning, code-compliant school in just five weeks. < Back Palisades Charter High School - Temporary Relocation In January 2025, the Palisades Fire tore through Pacific Palisades, destroying the Palisades Charter High School. Over 2,400 students and staff were displaced, with no campus to return to. The community urgently needed a solution that would restore in-person learning before the end of the school year. The answer came in the form of a vacant, 105,000-square-foot 1947 Sears building in downtown Santa Monica. Under a design-build delivery method, A.J. Kirkwood & Associates (AJK) was tasked with providing full electrical and low-voltage systems for a fast-tracked conversion into a fully functioning, code-compliant school in just five weeks. Our scope included complete electrical distribution, lighting, lighting controls, emergency egress, fire alarm, low-voltage systems, Wi-Fi, IT infrastructure, and HVAC connections across 93 classrooms on four floors, plus full power and life safety for seven exterior restroom trailers. Through precise planning, strong field leadership, and an unwavering commitment to the project’s mission, AJK delivered on time, under budget, and without a single recordable safety incident. Location Santa Monica, CA Build Partners C.W. Driver Gensler Size 105,000 sq. ft. Awards 2025 ABC National Excellence in Construction - 1st Place Eagle Award 2025 ABC SoCal Excellence in Construction - Merit Award 2025 ABC SoCal Excellence in Construction - President's Award https://video.wixstatic.com/video/91cf8b_d00aa128793f43fb9bff995a6b9b5558/1080p/mp4/file.mp4 https://video.wixstatic.com/video/91cf8b_0b2096f1793f47129517c4ccdd444903/1080p/mp4/file.mp4 1/9 Previous Next

  • CSULA - LA Biospace Rongxiang Xu Biospace Innovation Center | Electrical Construction

    The new facility on the CSULA campus houses both wet and dry laboratories for research and the creation of new business. < Back CSULA - LA Biospace Rongxiang Xu Biospace Innovation Center The LA Biospace Rongxiang Xu Biospace Innovation Center is a 2-story, 21,000-sq.ft. facility on the CSULA campus houses both wet and dry laboratories for research and the creation of new business. This LEED GOLD Certified space was created to provide entrepreneurs with laboratories, resources, and all the basic needs of biomedical research. Location Los Angeles, CA Build Partners Sundt Construction Lundstrom & Associates Architects Size 21,000 sq.ft. 272A3691-2.jpg 272A3691-2.jpg 1/1 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Public Works Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • 200 Mesnager | Electrical Construction

    200 Mesnager is a transformative mixed-use development that bridges Los Angeles’ industrial past with its urban residential future. < Back 200 Mesnager Located in the heart of the evolving Cornfield Arroyo district of Chinatown, 200 Mesnager is a transformative mixed-use development that bridges Los Angeles’ industrial past with its urban residential future. The 384,200-square-foot project consists of four wood-frame residential buildings (Type III) atop a concrete podium (Type I), creating a dynamic blend of residential, commercial, and public space. 200 Mesnager features 280 thoughtfully designed residential units and approximately 22,000 square feet of commercial space—blending street-level retail with creative office use. Amenities include a fitness center with a yoga studio, dog park, fire pit, BBQ area, housing support services, and a second-level pool deck. At its core, the project offers a publicly accessible open-air courtyard highlighted by a striking stainless-steel cable oculus—designed to serve as a vibrant community gathering space in a neighborhood on the rise. The development includes two levels of subterranean parking with 300 stalls for cars and motorcycles, supporting both residents and commercial tenants. AJK was responsible for the complete electrical scope of the project, including all power, lighting, and electrical distribution systems. Our team also installed the fire alarm and Distributed Antenna System (DAS), ensuring reliable communication and safety infrastructure throughout the site. Location Los Angeles, CA Build Partners Morley Builders GBD Architects Size 384,200 sq. ft. Photos Courtesy of parkeastla.com 1/9 Previous Next

  • Electrical Construction | Southern California

    ELECTRICAL CONSTRUCTION PRECONSTRUCTION We provide the time and resources so that our project and field management personnel can master all aspects of any project they are assigned to. Our field management people study in detail all other trades and the effect each will have on the electrical installation. Construction schedules are closely analyzed so that all materials, equipment, tools, and manpower are always available when required. ESTIMATING Give our experienced estimators a fully engineered set of drawings and specifications, and they will give you a detailed price, often with significant value engineering options. Give them a floor plan and design criteria and they will give you back a detailed price and scope of work all compliant with codes and local jurisdiction requirements. CONSTRUCTABILITY REVIEW We quickly and effectively review your project's plans and specifications to mitigate and address areas of risk and identify areas for cost savings. We take pride in long-term partnerships with our clients in building safe and lasting infrastructure.

  • Current Projects | Electrical Construction

    < Back Cypress College Fine Arts Previous Next

  • Metro Training & Innovation Center | Electrical Construction

    The new Los Angeles Metro Training & Innovation Center is a facility dedicated to professional development, technical training, and workforce empowerment. < Back Metro Training & Innovation Center The new Los Angeles Metro Training & Innovation Center is a facility dedicated to professional development, technical training, and workforce empowerment. This 14,881 sq. ft. tenant improvement project is located within a newly constructed core and shell building and includes both office space and an adjacent parking structure. The facility features five large, multi-functional rooms designed to serve as flexible conference spaces that accommodate a variety of uses including computer labs, training environments, and professional development programs. AJK was responsible for the full electrical scope of the project, including all power and lighting installations, advanced lighting controls, an inverter system, and the installation of five new electrical panels. In addition to the electrical infrastructure, AJK provided a comprehensive Tele/Data system and managed the complete low voltage scope, including fire alarm, intercom, access control, and integrated security systems. The project presented unique logistical challenges due to the 16-foot deck height and lack of elevator access to the third floor during construction, requiring creative planning and execution by the AJK team to safely deliver all equipment and complete work on schedule. Location Los Angeles, CA Build Partners Suffolk HDR Size 14,881 sq. ft. 1/6 Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page