Search Results
Search this site
252 results found with an empty search
- Voice Data | Electrical Construction
SPECIALTY SYSTEMS
- UCI - College of Health Sciences | Electrical Construction
The new UCI Susan & Henry Samueli College of Health Sciences Building will house the Susan Samueli Integrative Health Institute and the Sue & Bill Gross Nursing and Health Sciences Hall. < Back UCI - College of Health Sciences The new UCI Susan & Henry Samueli College of Health Sciences Building will house the Susan Samueli Integrative Health Institute and the Sue & Bill Gross Nursing and Health Sciences Hall. The Susan & Henry Samueli College of Health Sciences includes 63,600 assignable sq. ft. (108,200 gross sq. ft.) of dry research, instructional, student support, as well as academic and administrative office space, including a small food service facility. The Sue & Bill Gross Nursing and Health Sciences Hall includes approximately 43,100 assignable sq. ft. (71,500 gross sq. ft) of instructional space including a clinical skills laboratory; dry research space; student support space; and academic and administrative office space for the School of Nursing. The building has 5 levels. AJK provided electrical service MV backbone to the building (with ILB) and installed electrical backbone inside the building two back-up generators, all exterior & interior lighting, nLight lighting controls (including circadian rhythm controls in the clinic), all tel/data backbone from UCI source to the building (fiber), all tel/data backbone inside the building (fiber & copper), all tel/data branch cabling inside the building (copper), tel/data & security racking in MDF/IDF rooms, cabling & trim for complete security card access & camera system, sound masking LV backbone cabling, AV rough-in & LV cabling, room scheduler & Nurse call rough-in & cabling, Wi-Fi backbone cabling and trim, FA rough-in & cabling, design build Cellular DAS system, and (4) cellular carriers installation & programming. Location Irvine, CA Build Partners Hathaway Dinwiddie Harley Ellis Devereaux Size 180,000 sq. ft. Delivery Method Design-Build 1/24 Previous Next
- Evolution Fresh | Electrical Construction
AJK teamed up with Ledcor Construction to completely remodel an existing 250,000 SF warehouse to build Evolution Fresh, North America's largest fresh juice production and distribution facility. < Back Evolution Fresh AJK teamed up with Ledcor Construction to completely remodel an existing 250,000 s.f. warehouse to build Evolution Fresh, North America's largest fresh juice production and distribution facility. The building required extensive renovations and upgrades to accommodate the new facility including new utility systems, process production equipment, automation packaging systems, electrical service upgrades, wastewater treatment, compressed steam and air, and mechanical systems. The project had to be completed under a phased permitted fast-track approach to accommodate the accelerated project schedule and Starbucks' operational completion time frame requirements. AJK provided power and lighting for the whole project. Additional phases included wastewater expansion and fire sprinkler retrofit. Location Rancho Cucamonga, CA Build Partners Ledcor Construction Vertrees A&E Size 260,000 sq.ft. Delivery Method Design-Assist Photos Courtesy of Ledcor Group 1/2 Previous Next
- 8th & Hope | Electrical Construction
The 8th & Hope apartments is a mixed-use development with 22 stories, featuring 290 residential units, 6 floors of parking (including two below grade), and 5,000 sq. ft. of retail space that provides additional conveniences to residents. < Back 8th & Hope The 8th & Hope apartments, now known as Josephine DTLA, is a mixed-use development with 22 stories, featuring 290 residential units, 6 floors of parking (including two below grade), and 5,000 sq. ft. of retail space that provides additional conveniences to residents. Onsite amenities include an elevated 10,000 sf pool deck, a spa, a fountain, a fire pit, and a garden retreat. AJK installed power, lighting, fire alarm, CCTV, and access control. Location Los Angeles, CA Build Partners Matt Construction The Preston Partnership Size 588,500 sq. ft. Delivery Method Design-Build 1/1 Previous Next
- Universal Church Bonnie Brae | Electrical Construction
The Universal Church project included a 1,280 seat sanctuary, fellowship hall, gymnasium, choir room, preschool, and two levels of underground parking. < Back Universal Church Bonnie Brae The Universal Church project included a 1,280 seat sanctuary, fellowship hall, gymnasium, choir room, preschool, and two levels of underground parking. AJK installed power, lighting system, fire alarm, and voice/data. Location Los Angeles, CA Build Partners West Builders Gruen Associates Size 176,000 sq. ft. 1/3 Previous Next
- DAS | Electrical Construction
DISTRIBUTED ANTENNA SYSTEMS (DAS) DESIGN BUILD/ASSIST Many regions are adopting NFPA guidelines that mandate the installation of distributed antenna systems in larger buildings and new constructions to enhance radio frequencies according to code requirements. Our team consists iBwave-certified designers who possess in-depth knowledge codes and regulations. We are here to collaborate with you in designing a wireless DAS tailored to your needs, whether for a new or existing building. PUBLIC SAFETY DAS In an emergency, a dependable DAS system is crucial. It's essential for first responders, like firefighters and EMTs, to communicate effectively via their radios during critical events such as fires, natural disasters, and security threats. The NFPA and IFC have established regulations that local governments are implementing to create a secure and effective system for first responders and individuals impacted by. This ensures that radio signals are accessible to first responders throughout all areas of a building, including stairwells, elevators, and basements. CELLULAR DAS In today's world, organizations depend on dependable cellular coverage for efficient operations. Cellular DAS offers the essential coverage within buildings. Our team is ready to with pre-construction planning, RF grid testing, design by iBWave-certified professionals, as well as engineering and installation services tailored to your requirements. THIRD-PARTY TESTING We are a licensed BDA contractor with FCC certification, capable of conducting Public Safety 3rd Party Tests to assess and document off-the-air signal levels in accordance with the procedures outlined in the California Fire Code and local regulations. SYSTEM PARTNERS
- 24-7 Electrical & Low Voltage Service | A.J. Kirkwood
24/7 ELECTRICAL & LOW VOLTAGE SERVICE At A.J. Kirkwood & Associates, Inc., our service department is dedicated to providing top-tier electrical and low-voltage solutions across Southern California—from Ventura to San Diego. From design-build to maintenance, we power our work with proactive safety, responsive service, and integrity-driven craftsmanship. As a licensed C-10 systems integration contractor, we offer a full spectrum of services, including sales, engineering, installation, service, and maintenance. We specialize in design-build, new construction, retrofit, and tenant improvement projects, delivering customized solutions to meet the unique needs of our clients. Our team comprises highly trained, state-certified technicians and NICET-certified personnel, ensuring expert craftsmanship and reliable service. At AJK, we are committed to delivering high-quality work, exceptional service, and cost-effective solutions, making us the trusted partner for all your electrical and low-voltage needs. SERVICES Electrical Service & Maintenance Facilities Maintenance Parking Lot Lighting LED Retrofits & Lighting Controls Motor Controls Sub-Metering & Sub-Panels Temporary Generator Power Low Voltage Systems Fire & Life Safety Systems Security Systems: Access Control, CCTV, Intrusion Detection Voice/Data & Audio/Visual Intercom & Paging Systems Emergency Communication & ERCCS Systems Distributed Antenna Systems: Public-Safety & Cellular Annual Inspections & Testing Annual Fire Alarm Inspections Annual Emergency Power/Generator Testing Smoke Control Testing Annual Sprinkler Testing 5-Year Sprinkler Testing Fire Pump Testing Reg-4 Annual Inspections Title 24 Electrical Inspections Fire & Life Safety Experts Inspection & Testing: Annual, Semi-Annual, and Preventive Maintenance Retrofits & Upgrades: Ensure Code Compliance 24/7 Alarm Monitoring: Immediate Response for Emergencies CONTACT US 24/7 EMERGENCY SERVICE CALL: 1-844-266-0262 We look forward to the opportunity of working with you on your next project. Please call us or fill out the contact form below. Name* Phone Email* Company name Message Submit Privacy Notice: Information submitted through this form will be used only to respond to your inquiry or request. Please do not include confidential or sensitive information. By submitting this form, you acknowledge that your information will be processed in accordance with our Privacy Policy.
- Murietta Premiere Wellness & Rehab | Electrical Construction
The Ellison John Transitional Care Center is a skilled nursing facility, comprising 170 beds and has been meticulously designed to foster a supportive and compassionate environment conducive to healing, rejuvenation, and an enhanced quality of life. < Back Murietta Premiere Wellness & Rehab Rebranded as The Ellison John Transitional Care Center, this skilled nursing facility, comprising 170 beds, has been meticulously designed to foster a supportive and compassionate environment conducive to healing, rejuvenation, and an enhanced quality of life. With around-the-clock nursing care, the center is committed to patient well-being. The facility takes the form of a single-story building, partitioned into three nursing units. One of these units is dedicated to physical therapy and offers occupational therapy to aid patients in regaining the ability to perform everyday activities, mirroring those encountered in their homes. To ensure uninterrupted operation of critical services, AJK installed a robust 200kW Emergency Standby Generator, safeguarding the facility against potential power outages. In addition to this, AJK was responsible for the installation of the fire alarm system and a telecommunication nurse call system, further enhancing the safety and efficiency of the center's operations. Location Lancaster, CA Build Partners Sunseri Construction Douglas Pancake Architects Size 75,000 sq.ft. Photo Courtesy of Sunseri Construction 1/1 Previous Next
- Petersen Automotive Museum | Electrical Construction
The Petersen Automotive Museum project was a massive exterior and interior renovation to the existing iconic automobile museum. < Back Petersen Automotive Museum The Petersen Automotive Museum project was a massive exterior and interior renovation to the existing iconic automobile museum. The renovation included state-of-the-art lighting to the existing 4-story car museum and 22 exhibits. Location Los Angeles, CA Build Partners Matt Construction House & Robertson Architects Size 300,000 sq. ft. Delivery Method Design-Build 1/1 Previous Next
- Current Projects | Electrical Construction
< Back CSUF - Engineering & Computer Science Innovation Hub Previous Next
- Leadership
< Our Team Brad Hanenberg Senior Vice President of Strategy & Planning Brad started with AJK in 2007 after spending several years in the field and obtaining his Electrical Journeyman’s license. During his tenure, he has managed a variety of projects ranging in complexity, including design/build, high-rise construction, tenant improvements, museums, and historical restorations. He currently operates as the Company’s Senior Vice President of Strategy and Planning, managing risk through prefabrication and construction standardization.
- Coresite Data Center | Electrical Construction
The data center's special features include air-side economization, 95%-efficient UPS units in a 2N configuration, and the latest in energy-efficient technologies. < Back Coresite Data Center The project was built to LEED Gold certification standards and included the installation of (5) 2,000KW standby generators and an 8,000KW UPS system, and all primary/secondary hi-voltage gear and generator equipment. The data center's special features include air-side economization, 95%-efficient UPS units in a 2N configuration, and the latest in energy-efficient technologies. Location Santa Clara, CA Build Partners Matt Construction Teng & Associates Size 48,000 sq. ft. Photo #1 Courtesy of Nathaniel Riley 1/20 Previous Next










