top of page

Search Results

Search this site

252 results found with an empty search

  • Current Projects | Electrical Construction

    < Back CSUDH Phase IV - Residence Hall & Dining Commons Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Commercial/Office Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Leadership

    < Our Team Arch Kirkwood Chairman Emeritus & Founder The Kirkwood family has been serving the electrical industry for four generations. Arch began his career working part-time at Kirkwood Electric during high school and college. In 1964 Arch purchased the company from his father and, in a short number of years, quickly turned Kirkwood Electric into one of the largest electrical contractors in Southern California. Wanting to create an Employee Owned Company, Arch started AJK in 1996. Arch has now grown AJK into a significant player in the Southern California construction market.

  • Bowlero Ladera Ranch | Electrical Construction

    The Bowlero Ladera Ranch project was a 43,179-square-foot interior tenant improvement project that transformed an existing building into a vibrant, state-of-the-art bowling and entertainment venue. < Back Bowlero Ladera Ranch The Bowlero Ladera Ranch project was a 43,179-square-foot interior tenant improvement project that transformed an existing building into a vibrant, state-of-the-art bowling and entertainment venue. The new space features Bowlero’s signature design—a bold, retro-modern aesthetic paired with immersive lighting, high-end finishes, and cutting-edge gaming experiences. AJK provided complete electrical installation, including power distribution and lighting systems, delivering the infrastructure needed to support the venue’s dynamic atmosphere and operational demands. From the glow of the bowling lanes to the energy of the arcade and lounge areas, AJK’s work ensures that every aspect of the guest experience is powered seamlessly and reliably. Location Ladera Ranch, CA Build Partners Bayley Construction Arcadis Inc. Size 43,179 sq. ft. IMG_6464.JPG 1/15 Previous Next

  • Leadership

    < Our Team Michael Hewson CEO/CFO Michael Hewson, a distinguished UC Santa Barbara graduate, commenced his career at A.J. Kirkwood in 2007 as a project engineer. Through unwavering dedication and a strong work ethic, he ascended the ranks and now serves as the CEO/CFO of the Company. With a wealth of experience and financial acumen, Michael is a driving force at AJK. His profound care for both the organization and its valued employees is evident in his leadership approach.

  • La Marea Senior Living | Electrical Construction

    The La Marea Senior Living development is a two-story split-level senior living community designed to accommodate a 24-Hour Residential Care Facility for the Elderly (RCFE). < Back La Marea Senior Living The La Marea Senior Living development is a two-story split-level senior living community designed to accommodate a 24-Hour Residential Care Facility for the Elderly (RCFE). It comprises 104 assisted living, life guidance, and memory care units, with various amenities available for residents, including two courtyards, dining rooms, a commercial kitchen, and living and activities rooms. AJK undertook the installation of various essential systems for the facility, including electrical and power systems, tele/data communication infrastructure, CCTV (Closed-Circuit Television), access control systems, Distributed Antenna Systems (DAS), and AV (audiovisual) systems. Location Carlsbad, CA Build Partners W.E. O'Neil Construction Irwin Partners Architects Size 90,400 sq. ft. Photo Courtesy of W.E. O'Neil Construction 1/1 Previous Next

  • The Lot - Courtyard Building | Electrical Construction

    The structure consists of three stacked sections, each varying in height and orientation, serving to establish a central plaza within The Lot Campus. < Back The Lot - Courtyard Building The design of this new building placed significant emphasis on sustainability, community integration, and energy efficiency. The structure consists of three stacked sections, each varying in height and orientation, serving to establish a central plaza within The Lot Campus. It encompasses 98,000 square feet of office space and provides parking for 340 vehicles. Additionally, the building features seven sound stages and an on-site production facility, with a primary focus on serving the needs of media and entertainment companies. AJK was responsible for the installation of power systems, lighting solutions, and a Distributed Antenna System (DAS) for the project. Location West Hollywood, CA Build Partners Tectonics Construction, Inc. P+R Architects Size 98,000-sq.ft. 1/8 Previous Next

  • Produce LA | Electrical Construction

    Produce LA was a design-build project of a core & shell building with a parking garage. < Back Produce LA Produce LA was a design-build project of a core & shell building with a parking garage. The 5-level office and retail complex is located in the Arts Distrct of downtown Los Angeles. AJK installed power, lighting, fire alarm system, and access control system. Location Los Angeles, CA Build Partners Pankow Builders EYRC Architects Size Office 91,248 sq. ft. Retail 9,436 sq. ft. Restaurant 6,541 sq. ft Delivery Method Design-Build Photos Courtesy of EYRC Architects 1/2 Previous Next

  • Pomona College - Rains Athletic Center | Electrical Construction

    The athletic and recreation center will include gymnasium spaces, fitness rooms, locker rooms, classrooms, and offices for coaches and administrative staff. < Back Pomona College - Rains Athletic Center The new Rains Athletic Center at Pomona College was built to be 15,000 sq. ft. larger than the existing building. The athletic and recreation center will include gymnasium spaces, fitness rooms, locker rooms, classrooms, and offices for coaches and administrative staff. AJK installed power, lighting, and fire alarm. Location Pomona, CA Build Partners C.W. Driver SCB Architects, Inc. Size 25,590 sq. ft. renovation (1-story) 74,335 sq. ft. new construction (2-story) 1/4 Previous Next

  • Upcoming Events | A.J. Kirkwood

    SAFETY & EDUCATION Safety required information and upcoming education opportunities. 13th Annual Company Picnic Date : Saturday, August 15, 2026 Time : 11am - 3pm Location : Irvine Regional Park (Coyote Corner) 1 Irvine Park Rd, Orange, CA 92869, Orange, CA 92869

  • Terasaki Institute for Biomedical Innovation | Electrical Construction

    The Terasaki Institute is a two-story facility that conducts biomedical research, and the building includes labs, lab support, office spaces, and a vivarium for specimen storage. < Back Terasaki Institute for Biomedical Innovation The Terasaki Institute is a two-story facility that conducts biomedical research, and the building includes labs, lab support, office spaces, and a vivarium for specimen storage. For the tenant improvement, AJK installed all electrical and power, a new 1200A switchboard, panels, and transformers, 31kW generator, interior lighting, lighting control (nLight system), fire alarm, DAS, voice/data, security, and AV conduit. Location Woodland Hills, CA Build Partners Matt Construction CO Architects Size 47,000 sq. ft. Photos courtsey of Matt Construction & CO Architects 1671570376093.jpg 1/7 Previous Next

  • CSUF - Visual Arts Complex | Electrical Construction

    The CSUF Visual Arts Complex underwent a comprehensive 110,000-square-foot modernization aimed at revitalizing Buildings A, B, C, and D. < Back CSUF - Visual Arts Complex The California State University, Fullerton (CSUF) Visual Arts Complex underwent a comprehensive 110,000-square-foot modernization aimed at revitalizing Buildings A, B, C, and D. This extensive renovation addressed functional and building code deficiencies, resolved outdated programmatic elements, and significantly extended the facilities' life expectancy by an additional 50 years. Every aspect of the original structures was upgraded or replaced to support modern academic and creative needs. In addition, Building F was demolished to make way for a brand-new, two-story, 13,000-square-foot facility designed to house state-of-the-art technology and teaching spaces, enhancing the university’s ability to support contemporary arts education. AJK was responsible for the complete installation of electrical and power systems, lighting, fire alarm system, telecommunications, and low-voltage systems throughout the complex. The scope also included audiovisual infrastructure and access control, ensuring that the upgraded and new buildings are equipped with advanced, integrated systems to support a dynamic and flexible learning environment. Location Fullerton, CA Build Partners C.W. Driver HGA Size 110,000 sq. ft. Delivery Method Design-Assist Photos Courtesy of HGA 1/6 Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page