Search Results
Search this site
246 results found with an empty search
- The WALK | Electrical Construction
The Walk – Norwalk is a new 13-acre mixed-use development that will bring together shopping, dining, entertainment, and residential living in a vibrant, walkable community. < Back The WALK The Walk – Norwalk is a new 13-acre mixed-use development that will bring together shopping, dining, entertainment, and residential living in a vibrant, walkable community. The project includes nearly 89,000 square feet of retail and restaurant space, more than 370 apartment homes including affordable housing, and inviting outdoor plazas and green spaces. Built with the future in mind, the development features all-electric residential buildings, rooftop solar systems, and pedestrian-first design, while thoughtfully preserving the site’s historic monuments and public art. Location Norwalk, CA Build Partners Modblt Modular Construction Assemblage Work 1/1 Previous Next
- Ganahl Lumber - SJC | Electrical Construction
The new state-of-the-art facility comprises of 15 structures, including 3 main buildings, a guard house, and 11 sheds. < Back Ganahl Lumber - SJC The new state-of-the-art facility comprises of 15 structures, including 3 main buildings, a guard house, and 11 sheds. The main buildings are used for retail/office, lumberyard, and drive-thru storage. The property also includes 6,000 sq. ft. for future restaurant space and gravel parking lot nearby for long-term vehicle storage. AJK installed power, lighting, fire alarm, CCTV, intrusion, intercom, voice data, DAS, and AV. Location San Juan Capistrano, CA Build Partners Ganahl Construction Corporation Withee Malcom Size 16-acres 1/18 Previous Next
- Mammoth Hospital | A.J. Kirkwood
< Back Ridgecrest Regional Hospital The expansion of Ridgecrest Regional Hospital included the addition of a new Outpatient Services center, a new entrance, and a new cafeteria. Additionally, a new three-story tower was constructed, featuring a modern surgery suite, ICU/CCU, inpatient beds, and pediatric beds. Location Ridgecrest, CA Build Partners McCarthy Builders Size 47,000 sq. ft. Ridgecrest RH Outpatient Pavilion.jpg Ridgecrest RH Outpatient Pavilion.jpg 1/1 Previous Next
- Wilshire & La Jolla Tower | Electrical Construction
The Wilshire & La Jolla Tower is a mixed-use residential and commercial high-rise structure located at the intersection of Wilshire Boulevard and La Jolla. < Back Wilshire & La Jolla Tower The Wilshire & La Jolla Tower is a versatile mixed-use high-rise structure situated at the intersection of Wilshire Boulevard and La Jolla. This development encompasses 112 apartments located above a parking garage, 6,000 square feet of retail and restaurant space, along with four levels of above-grade parking. Notable amenities are available on both the sky deck and podium levels. AJK's scope of work included fixture lighting, lighting controls, submetering, bus duct installation, generator setup, switchgear installation, seismic sensing systems, lightning protection, FAA lighting, LADWP slab box, and conduit installation. AJK's low voltage team handled the installation of fire alarm and smoke control systems, voice-data infrastructure, audio-visual equipment, access control systems, CCTV systems (including fire department cameras), Distributed Antenna Systems (DAS), area of refuge systems, and Honeywell Lyric Climate Control integration. Location Los Angeles, CA Build Partners Gilbane Building Company Steinberg Hart Size 307,000 sq. ft. 1/19 Previous Next
- La Marea Senior Living | Electrical Construction
The La Marea Senior Living development is a two-story split-level senior living community designed to accommodate a 24-Hour Residential Care Facility for the Elderly (RCFE). < Back La Marea Senior Living The La Marea Senior Living development is a two-story split-level senior living community designed to accommodate a 24-Hour Residential Care Facility for the Elderly (RCFE). It comprises 104 assisted living, life guidance, and memory care units, with various amenities available for residents, including two courtyards, dining rooms, a commercial kitchen, and living and activities rooms. AJK undertook the installation of various essential systems for the facility, including electrical and power systems, tele/data communication infrastructure, CCTV (Closed-Circuit Television), access control systems, Distributed Antenna Systems (DAS), and AV (audiovisual) systems. Location Carlsbad, CA Build Partners W.E. O'Neil Construction Irwin Partners Architects Size 90,400 sq. ft. Photo Courtesy of W.E. O'Neil Construction 1/1 Previous Next
- Bicycle Club Casino & Hotel | Electrical Construction
The Bicycle Club Casino & Hotel is a 7-story, 100-room five-star hotel in Bell Gardens, CA. < Back Bicycle Club Casino & Hotel The Bicycle Club Casino & Hotel is a 7-story, 99 key, boutique hotel connected to the original Bicycle Casino. The hotel features a penthouse nightclub, brewpub & gourmet restaurant, bakery/cafe, 15,000 sq. ft. multi-function room, rooftop gaming room, and an outdoor 2nd floor with a pool and spa. AJK installed power, lighting, fire alarm, voice/data, audio/visual, and security system. Location Bell Gardens, CA Build Partners R.D Olson Construction Lee & Sakahara Architects Size 117,907 sq. ft. 1/1 Previous Next
- Disney Grand Central Air Terminal | Electrical Construction
Located on Disney’s Grand Central Creative Campus off of Flower Street, The Grand Central Air Terminal was given a total makeover to restore its appearance from the 1929-1959 period while also serving as an events space and visitor center as well as housing media offices. < Back Disney Grand Central Air Terminal Located on Disney’s Grand Central Creative Campus off of Flower Street, The Grand Central Air Terminal was given a total makeover to restore its appearance from the 1929-1959 period while also serving as an events space and visitor center as well as housing media offices. Location Glendale, CA Build Partners PCLConstruction Federick Fisher Partners Size 25,000 sq. ft. Delivery Method Design-Build IMG_4746.jpg 1/3 Previous Next
- Portfolio | A.J. Kirkwood
< Back Multi-Family/Mixed-Use Power in Numbers Programs Locations Volunteers Project Gallery Previous Next
- Portfolio | A.J. Kirkwood
< Back Current Projects Power in Numbers Programs Locations Volunteers Project Gallery Previous Next
- Metro Training & Innovation Center | Electrical Construction
The new Los Angeles Metro Training & Innovation Center is a facility dedicated to professional development, technical training, and workforce empowerment. < Back Metro Training & Innovation Center The new Los Angeles Metro Training & Innovation Center is a facility dedicated to professional development, technical training, and workforce empowerment. This 14,881 sq. ft. tenant improvement project is located within a newly constructed core and shell building and includes both office space and an adjacent parking structure. The facility features five large, multi-functional rooms designed to serve as flexible conference spaces that accommodate a variety of uses including computer labs, training environments, and professional development programs. AJK was responsible for the full electrical scope of the project, including all power and lighting installations, advanced lighting controls, an inverter system, and the installation of five new electrical panels. In addition to the electrical infrastructure, AJK provided a comprehensive Tele/Data system and managed the complete low voltage scope, including fire alarm, intercom, access control, and integrated security systems. The project presented unique logistical challenges due to the 16-foot deck height and lack of elevator access to the third floor during construction, requiring creative planning and execution by the AJK team to safely deliver all equipment and complete work on schedule. Location Los Angeles, CA Build Partners Suffolk HDR Size 14,881 sq. ft. 1/6 Previous Next
- Current Projects | Electrical Construction
< Back Carmel Bundy Previous Next
- NASA Jet Propulsion Laboratory | Electrical Construction
The NASA JPL FEIF was built to provide a centralized hub for the fabrication, assembly, integration, and testing of advanced flight and ground-based electronic hardware and subsystems. < Back NASA Jet Propulsion Laboratory The Flight Electronic Integration Facility (FEIF) was built to provide a centralized hub for the fabrication, assembly, integration, and testing of advanced flight and ground-based electronic hardware and subsystems. Designed to support cutting-edge aerospace research and development, the facility houses specialized spaces for electronic and microelectronic fabrication, hybrid design, multi-chip module production, circuit card and box assembly, and cable and harness manufacturing. The facility features Class 300K, 100K, and 10K cleanrooms, along with dedicated areas for parts storage, testing, and systems integration to ensure the highest standards of quality and precision. It also includes research laboratories focused on battery technology, thermoelectric power, and prototype development, as well as collaborative office space that brings together multidisciplinary teams to advance innovation, testing, and quality assurance. Location Pasadena, CA Build Partners McCarthy Builders Gensler Size 41,000 sq. ft. 1/9 Previous Next











