  • Evolution Fresh | Electrical Construction

    AJK teamed up with Ledcor Construction to completely remodel an existing 250,000 SF warehouse to build Evolution Fresh, North America's largest fresh juice production and distribution facility. < Back Evolution Fresh AJK teamed up with Ledcor Construction to completely remodel an existing 250,000 s.f. warehouse to build Evolution Fresh, North America's largest fresh juice production and distribution facility. The building required extensive renovations and upgrades to accommodate the new facility including new utility systems, process production equipment, automation packaging systems, electrical service upgrades, wastewater treatment, compressed steam and air, and mechanical systems. The project had to be completed under a phased permitted fast-track approach to accommodate the accelerated project schedule and Starbucks' operational completion time frame requirements. AJK provided power and lighting for the whole project. Additional phases included wastewater expansion and fire sprinkler retrofit. Location Rancho Cucamonga, CA Build Partners Ledcor Construction Vertrees A&E Size 260,000 sq.ft. Delivery Method Design-Assist Photos Courtesy of Ledcor Group 1/2 Previous Next

  • Universal Church Bonnie Brae | Electrical Construction

    The Universal Church project included a 1,280 seat sanctuary, fellowship hall, gymnasium, choir room, preschool, and two levels of underground parking. < Back Universal Church Bonnie Brae The Universal Church project included a 1,280 seat sanctuary, fellowship hall, gymnasium, choir room, preschool, and two levels of underground parking. AJK installed power, lighting system, fire alarm, and voice/data. Location Los Angeles, CA Build Partners West Builders Gruen Associates Size 176,000 sq. ft. 1/3 Previous Next

  • Security Systems | Electrical Construction

    SECURITY OUR GOAL IS TO PROVIDE SUPERIOR PROTECTION FOR YOUR BUILDING, ASSETS, AND PEOPLE We provide a range of solutions, from IP-based video and access to basic intrusion alarm systems. Our team is dedicated to working with you to identify the solution that fits your requirements. From design and construction to plans and specifications, we deliver a comprehensive solution that can transform how businesses function. SERVICES DESIGN, INSTALL, AND SERVICE: Access Control Systems Intrusion Detection Video surveillance Telephone Entry Systems SYSTEM PARTNERS

  • Pasadena Conservatory of Music Learning Center | Electrical Construction

    The Pasadena Conservatory of Music Learning Center is part of the second phase of the campus master plan. < Back Pasadena Conservatory of Music Learning Center The Pasadena Conservatory of Music Learning Center is part of the second phase of the campus master plan. The project modernizes and expands the campus with new instructional spaces, enhanced amenities, and thoughtfully designed outdoor environments. The project includes the demolition of an existing single-story building and the construction of a new two-story Learning Center connected to the main campus by an elevated bridge. The new facility provides additional classrooms, studios, and collaborative learning spaces, while renovations to the existing building create updated administrative offices, reception, and waiting areas. Site improvements also include new utility infrastructure and a beautifully landscaped outdoor amphitheater, providing a dynamic venue for performances, events, and community engagement. Through this transformation, the Pacific Conservatory of Music is creating an inspiring environment that supports artistic excellence, collaboration, and future growth. Location Pasadena, CA Build Partners Morley Builders Architectural Resources Group Size 17,133 sq. ft. Pasadena Conservatory of Music.JPG 1/3 Previous Next

  • CSULA - LA Biospace Rongxiang Xu Biospace Innovation Center | Electrical Construction

    The new facility on the CSULA campus houses both wet and dry laboratories for research and the creation of new business. < Back CSULA - LA Biospace Rongxiang Xu Biospace Innovation Center A new 2-story, 21,000-sq.ft. facility on the CSULA campus houses both wet and dry laboratories for research and the creation of new business. This LEED GOLD Certified space was created to provide entrepreneurs with laboratories, resources, and all the basic needs of biomedical research. Location Los Angeles, CA Build Partners Sundt Construction Lundstrom & Associates Architects Size 21,000 sq.ft. 1/1 Previous Next

  • Target @ Hollywood Galaxy | Electrical Construction

    The new 2-level interior finish-out in an existing shell building, Target @ Hollywood Galaxy, is located on Hollywood Blvd at the Hollywood Galaxy Mall. < Back Target @ Hollywood Galaxy Located on Hollywood Blvd at the Hollywood Galaxy Mall, the new 2-level Target tenant interior finish-out in an existing shell building includes a Starbucks, a grocery selection with fresh produce, an adult beverage section, apparel and accessories for adults, home decor and essentials, and health and beauty products. This store also allows customers to place drive-up and pick-up orders including groceries, and have these items brought out to their cars for customer convienence. AJK installed electrical power and lighting to the exterior, sales floor, restrooms, fitting rooms, guest service/pick-up, offices, grocery, and stock. Location Los Angeles, CA Build Partners Curtom-Dunsmuir Callison RTKL Size 37,000 sq. ft. 1/4 Previous Next

  • CSUDH - Innovation & Instruction Building | Electrical Construction

    The design for each space of the 4-story building focuses on creating an active collaborative learning/meeting environment. < Back CSUDH - Innovation & Instruction Building The steel-frame structure houses general university and business school classrooms, faculty/administration offices, an event center, and a café. The design for each space of the 4-story building focuses on creating an active collaborative learning/meeting environment. AJK installed power, lighting, voice/data, and DAS for this project. Location Carson, CA Build Partners C.W. Driver HGA Architects Size 108,000 sq.ft. CSUDH I&I.png CSUDH I&I.png 1/1 Previous Next

  • Mariner's Church Youth Building | Electrical Construction

    The Mariner’s Church’s master-planned project was developed in a series of phases. < Back Mariner's Church Youth Building The Mariner’s Church’s master-planned project was developed in a series of phases. Approximately 80% of the site has been improved or newly constructed from vacant land. The new youth center facility included the expansion of campus facilities from two existing buildings to seven major buildings, two auditoriums, offices, meeting areas, parking structures, and new outdoor facilities and playspace. The campus site setting was designed to accommodate special occasions, including weddings and other gatherings. AJK provided site electrical improvements including power & lighting, fire alarm system, voice/data, and audio/visual cabling. Location Irvine, CA Build Partners Oltmans Construction DeRevere & Associates Size 27,000 sq. ft. Delivery Method Design-Build Photo Courtesy of Sacks Del Mar 1/9 Previous Next

  • Contact Sheet | A.J. Kirkwood

    CONTACT SHEET Please refer to the corresponding contact for any questions or concerns. HEADQUARTERS A.J. Kirkwood & Associates, Inc. Business Name 4300 N. Harbor Blvd. Fullerton, CA 92835 Address (714) 505-1977 Telephone Number HUMAN RESOURCES DEPARTMENT Lauren Lu Human Resources Generalist (657) 631-2668 Telephone Number Lauren.Lu@AJK-A.com Email Address 401(k), 401(k) LOANS, AND EMPLOYER STOCK OWNERSHIP PLAN (ESOP) The following information is your primary contact for 401(k) Related Questions, including loans, distributions, contributions, fund allocations and balance-related questions Below includes your contact for ESOP-related questions as well. Please remember that related questions require more time for responses. Lloyd Engleman Primary 401(k) Contact Accelerate Retirement, www.accelerateretirement.com Brokerage Name and Website (951) 780-4016 (Office) Direct Phone Number (Work) (951) 990-8457 (Cell) Lloyd.Engleman@accelerateretirement.com Email Address 401k_ESOP@AJK-A.com ESOP Email - Direct to AJK 401k Dashboard Retirement Plan Loans PAYROLL TEAM The following contacts will support any payroll related question you may have: Stephanie Ramos Payroll Supervisor Title Stephanie.Ramos@AJK-A.com Email Address (714) 505-1977 ext. 181 Telephone Number Payroll Team Payroll@AJK-A.com Email Address SAFETY CONCERNS Steven Dietzel Name Safety Manager Title Steve.Dietzel@AJK-A.com Email Address (714) 773-2669 Telephone Number LABOR MANAGEMENT, MANPOWER, AND GENERAL INFO REGARDING THE FIELD Carlos Bello Name Director of People & Culture Title Carlos.Bello@AJK-A.com Email Address (714) 321-8396 Telephone Number INFORMATION TECHNOLOGY NEEDS Chris Urioste Name Information Technology Manager Title HelpDesk@AJK-A.com Email Address (714) 505-1977 ext. 777 Telephone Number

  • Ridgecrest Regional Hospital | A.J. Kirkwood

    < Back Ridgecrest Regional Hospital The expansion of Ridgecrest Regional Hospital included the addition of a new Outpatient Services center, a new entrance, and a new cafeteria. Additionally, a new three-story tower was constructed, featuring a modern surgery suite, ICU/CCU, inpatient beds, and pediatric beds. Location Ridgecrest, CA Build Partners McCarthy Builders Size 47,000 sq. ft. Ridgecrest RH Outpatient Pavilion.jpg Ridgecrest RH Outpatient Pavilion.jpg 1/1 Previous Next

  • CSUN Student Housing Bldgs. 22 & 23 | Electrical Construction

    The CSUN Student Housing Project includes two four-story, mixed-use student housing buildings designed to enhance campus living and support student success. < Back CSUN Student Housing Bldgs. 22 & 23 The CSUN Student Housing Project includes two four-story, mixed-use student housing buildings designed to enhance campus living and support student success. Each building features multi-purpose rooms, classrooms, and conference spaces on the ground level, with Levels 2 through 4 dedicated to student housing. In total, each building contains 51 dormitory units, providing modern, convenient accommodations within walking distance of California State University, Northridge’s academic core. AJK provided complete electrical construction services for the project, including electrical systems, site lighting, solar, LADWP scope, telecommunications and low-voltage systems, audio/visual, fire alarm, DAS, gunshot detection, and areas of refuge. Location Northridge, CA Build Partners C.W. Driver A.C. Martin Partners Size 60,290 sq. ft. CSUN Student Housing Buildings 22 & 23.jpg CSUN Student Housing Buildings 22 & 23.jpg 1/1 Previous Next

  • Coresite Data Center | Electrical Construction

    The data center's special features include air-side economization, 95%-efficient UPS units in a 2N configuration, and the latest in energy-efficient technologies. < Back Coresite Data Center The project was built to LEED Gold certification standards and included the installation of (5) 2,000KW standby generators and an 8,000KW UPS system, and all primary/secondary hi-voltage gear and generator equipment. The data center's special features include air-side economization, 95%-efficient UPS units in a 2N configuration, and the latest in energy-efficient technologies. Location Santa Clara, CA Build Partners Matt Construction Teng & Associates Size 48,000 sq. ft. Photo #1 Courtesy of Nathaniel Riley 1/20 Previous Next