Search Results
Search this site
246 results found with an empty search
- CSULB - Walter Pyramid | Electrical Construction
Moving toward sustainability, CSULB updated the athletic and event center’s lighting with new energy-efficient lighting. < Back CSULB - Walter Pyramid Moving toward sustainability, CSULB updated the athletic and event center’s lighting with new energy-efficient lighting. The updating LED light system saves on energy consumption and also offers the school more advanced setting options. The upgraded lights utilize digital controls, dimmers, and changeable colored lights. Location Long Beach, CA Build Partners C.W. Driver Zimmer Gunsul Frasca Architects, LLP Size 39,000 sq.ft. 1/1 Previous Next
- The 909 Sports Bar + Food Hall | Electrical Construction
The 909 is a new state-of-the-art food hall at YAAMAVA Resort & Casino at San Manuel. < Back The 909 Sports Bar + Food Hall The 909 is a new state-of-the-art food hall at YAAMAVA Resort & Casino at San Manuel. The establishment features 78 seats for bar-top gaming with wall-to-wall LEDs. A wall feature including 150+ screens spanning 50 ft. wide and 12 ft. tall provides the ultimate viewing experience. AJK installed new power panels and feeders throughout the space and 15 new floor boxes to new and relocated slot banks. All new RGBW lighting was furnished and installed throughout the space. New 6" beverage lines from the beer and liquor coolers were installed to each of the 3 bar locations. The routing for the beverage lines were overhead and underneath the level one ceiling space and stubbed up into the bar area. All new CAT-5 and fiber optic cabling was installed to each of the new slot machines within the bars along with cabling for all new speakers. FO cable was installed to many screens in the venue space. Throughout the active casino floor, all new 144 strand fiber, spanning 1,312 feet was furnished and installed. A challenging aspect of the project was all of the work was done in an active casino and a majority of the work was done amongst the public. Location Highland, CA Build Partners PENTA Building Group Klai Juba Wald Size 1,300 sq. ft. 1/9 Previous Next
- Casa Dorinda | Electrical Construction
Casa Dorinda is a historic senior living community on 48 acres in Montecito and is the only senior retirement campus in the community. < Back Casa Dorinda Casa Dorinda is a distinguished senior living community nestled on 48 acres in Montecito, serving as the exclusive senior retirement campus in the area, offering a comprehensive range of LifeCare services. This encompasses Independent Living, Assisted Living, Memory Care, and Skilled Nursing, all seamlessly integrated within the community. The Casa Dorinda Bliss Expansion project comprised several sub-projects, including the construction of a new Independent Living (IL) complex featuring three buildings, the addition of ten new villas, the extension of a two-story wing to the existing Personal Care (PCU)/Memory Care (MCU) building, and the creation of a new restaurant. AJK was responsible for the installation of power and lighting for the entire expansion initiative. The Independent Living complex involved the construction of three buildings, totaling 11 units, situated atop a new parking garage podium. The villa construction encompassed the development of nine individual single-story villas and one single-story duplex. In the case of the Personal Care/Memory Care building, the addition of the new two-story wing brought forth 21 additional personal/memory care living units and new communal spaces. The existing Personal Care/Memory Care buildings underwent remodeling and partial repurposing to align with the new wing's design. Lastly, the Resident Grill, a new 4,400 square foot restaurant, was introduced at the heart of the Casa Dorinda campus. Location Montecito, CA Build Partners Sunseri Construction Cearnal Collective Size 72,875 sq.ft. Photo Courtesy of Sunseri Construction 1/1 Previous Next
- Portfolio | A.J. Kirkwood
< Back Higher Education Power in Numbers Programs Locations Volunteers Project Gallery Previous Next
- Hilton Arcadia Los Angeles | Electrical Construction
The Hilton Hotel Arcadia is a transformative hospitality project combining the adaptive reuse of an existing three-story office building with the construction of a new six-story tower. < Back Hilton Arcadia Los Angeles The Hilton Hotel Arcadia is a transformative hospitality project combining the adaptive reuse of an existing three-story office building with the construction of a new six-story tower. The hotel offers 173 finely appointed guest rooms, a full-service restaurant, a banquet hall, meeting spaces, and a rooftop bar with panoramic views of the iconic Santa Anita Racetrack. Spanning a total of 138,000 square feet, the development merges modern luxury with functional design across two integrated structures. The revitalization of the existing building breathes new life into the property, while the newly constructed tower enhances the skyline of Arcadia with its contemporary architecture. AJK is proud to contribute to the success of this landmark project. Our scope of work includes the installation and integration of the public safety Distributed Antenna System (DAS), a comprehensive fire alarm system, and complete power and lighting infrastructure. In addition, AJK is responsible for implementing advanced lighting controls to enhance energy efficiency, ambiance, and guest comfort throughout the hotel. Location Arcadia, CA Build Partners R.D Olson Construction AXIS / GFA Architecture & Design Size 138,000 sq. ft. Photos courtesy of R.D Olson Construction https://video.wixstatic.com/video/91cf8b_4ffc725ca3e242e387513e9021f0f30c/1080p/mp4/file.mp4 1/13 Previous Next
- OCC Student Housing | Electrical Construction
This is placeholder text. To change this content, double-click on the element and click Change Content. < Back OCC Student Housing OCC's new student housing complex is four stories high comprised of 9 total buildings and features 323 units and 823 beds. Amenities include study lounges, exterior courtyards, and administrative offices. AJK installed power and lighting for this project. Location Costa Mesa, CA Build Partners Moss Construction HPI Architecture Size 332,000 sq.ft. 1/2 Previous Next
- Autry Museum | Electrical Construction
The Autry Resources Center was an adaptive reuse project that re-configured three existing industrial buildings into a state-of-the-art storage and conservation facility. < Back Autry Museum The Autry Resources Center was an adaptive reuse project that re-configured three existing industrial buildings into a state-of-the-art storage and conservation facility. This included climate-controlled storage rooms, conservation laboratories, and a photo studio. Additional scope entailed a conference room, reading room, curatorial offices, and a private ceremonial garden. Location Burbank, CA Build Partners Matt Construction Chu + Gooding Architects Size 103,000-sq. ft. _72A3180-2.jpg _72A3168-2.jpg 1/3 Previous Next
- Cypress College Fine Arts | Electrical Construction
The Cypress College Fine Arts renovation project entails a comprehensive overhaul of the existing 1969, 3-story, 66,765-square-foot building. < Back Cypress College Fine Arts The Cypress College Fine Arts renovation project entails a comprehensive overhaul of the existing 1969, 3-story (+mezzanine), 66,765-square-foot building. The renovated building will feature state-of-the-art amenities, including lighting, lighting controls, theater lighting, sound recording rooms, photography labs, ceramic labs, theater arts classrooms, and a performance theater. Through this project, Cypress College Fine Arts aims to create a dynamic and conducive environment for artistic expression and education. The primary objective is to modernize and enhance the facilities to accommodate various fine arts programs. This includes seismic upgrades to the concrete structure, installation of metal framing, exposed T-bar ceilings, and decorative paneling. Additionally, electrical upgrades such as rigid conduit, EMT, and MV switches will be implemented, along with the installation of a 1500kVA 4160V/480V transformer. The project also involves reworking existing MV intercepts, relocating duct banks, and installing new MV and LV switchgear. Furthermore, the addition of a 175KW generator and fire pump will enhance safety measures. Location Cypress, CA Build Partners Sundt Construction Inc. DLR Size 66,765 sq. ft. https://video.wixstatic.com/video/91cf8b_b4c254515d7c4782aeabad089a8d3b48/1080p/mp4/file.mp4 1/7 Previous Next
- Inn at the Mission San Juan Capistrano | Electrical Construction
Located directly across from the Mission San Juan Capistrano, the new three-story ground-up hotel (Building C) features 124 guest rooms, 8 suites, a full-service spa, a signature restaurant, and various courtyards. < Back Inn at the Mission San Juan Capistrano Located directly across from the Mission San Juan Capistrano, the new three-story ground-up hotel (Building C) features 124 guest rooms, 8 suites, a full-service spa, a signature restaurant, and various courtyards that serve as a gathering point and connection to the historic downtown city and mission. The site also features a two-story commercial building (Building A and Building B). Location San Juan Capistrano, CA Build Partners R.D. Olson Architects Orange Size 106,900 sq. ft. 1/1 Previous Next
- Current Projects | Electrical Construction
< Back The WALK - Market-Rate Residential Housing Previous Next
- Long Beach City College - Building M | Electrical Construction
Long Beach City College - Building M is a multi-disciplinary facility located at the Liberal Arts Campus. < Back Long Beach City College - Building M Long Beach City College - Building M is a multi-disciplinary facility located at the Liberal Arts Campus. The building houses language arts, career technology education, computer and office studies, the student success center, and student success and support programs. The project consisted of the demolition of the existing "M" and "N" buildings and the design and construction of the new building "M". AJK extended/reworked medium voltage circuits and fiber optic cabling for the new building. New switchgear and inverters were also installed. New lighting and lighting controls were installed to the interior and exterior of the building. Our low voltage team installed structured cabling, audio visual infrastructure, public safety and cell DAS, and assisted with the design and partial installation of access control lockdown system. Location Long Beach, CA Build Partners C.W. Driver HPI Architecture Size 95,500 sq. ft. Delivery Method Design-Assist Photos Courtesy of HPI Architecture 1/5 Previous Next
- Arizona State University | Electrical Construction
Arizona State University is now calling the existing historic Herald Examiner Building home for its satellite School of Journalism. < Back Arizona State University Arizona State University is now calling the existing historic Herald Examiner Building home for its satellite School of Journalism. The scope included interior build-out for primary office use with ancillary conference rooms, creative office suites, higher education classrooms, retail shops, and restaurants. Over 80% of the refurbished space is dedicated to ASU’s facilities, including a two-story events area and a raised third-floor open kitchen cafe and admin area set beneath refurbished skylights. AJK provided power, lighting, and communication systems. Location Los Angeles, CA Build Partners Matt Construction Gensler Size 136,000 sq.ft. 1/1 Previous Next












