top of page

Search Results

Search this site

246 results found with an empty search

  • UCLA - Center for Health Science | Electrical Construction

    The retrofit of the former hospital structure was divided into two phases to maintain existing operations of lower-level medical laboratories. < Back UCLA - Center for Health Science Designed to LEED Platinum Certification standards, the retrofit of the former hospital structure was divided into two phases to maintain existing operations of lower-level medical laboratories. The priority of the renovation into state-of-the-art research laboratories and offices was the building’s energy efficiency, life safety infrastructure, and seismic III rating sustainability throughout the facility. AJK provided power & lighting and new fire alarm system throughout the East, West, and Southeast wings, and Biomedical library. Location Los Angeles, CA Build Partners PCL Construction Zimmer Gunsul Frasca Archtects, LLP Size 874,800 sq.ft. Photo Courtesy of Paul Turang Photography/PCL 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back Cypress College Fine Arts Previous Next

  • Current Projects | Electrical Construction

    < Back Pasadena Central Library Previous Next

  • OC Great Parks - Sports Park | Electrical Construction

    For Orange County Residents, the Great Park has become a central point for recreation. < Back OC Great Parks - Sports Park For Orange County Residents, the Great Park has become a central point for recreation. The construction of the sports stadiums spans 175 acres of the park. The premier recreational sports park includes a soccer championship grandstand building, baseball championship grandstand building, softball championship grandstand building, support buildings for tennis, soccer, and baseball. AJK installed power, lighting, fire alarm, and special systems for each structure. Location Irvine, CA Build Partners KPRS NBBJ Size Spans 175 acres Delivery Method Design-Build Photo Courtesy of KPRS Inc. 1/1 Previous Next

  • Thompson Hotel | Electrical Construction

    Located in the heart of Hollywood, this 11-story, 115-foot-tall building features 190 guest rooms with 16 suites and two immersive restaurants. < Back Thompson Hotel Located in the heart of Hollywood, this 11-story, 115-foot-tall building features 190 guest rooms with 16 suites and two immersive restaurants. It also includes 15,000 square feet of event space, a modern, high-tech fitness center, along with stunning views from the rooftop pool, deck, and lounge. AJK installed power and lighting, fire alarm system, voice/data, and DAS for this project. Location Los Angeles, CA Build Partners Suffolk Construction Steinberg Architects Size 179,600 sq. ft. Delivery Method Design-Build 1/2 Previous Next

  • Petco Park Suite Renovations | Electrical Construction

    The Petco Park Suite renovations included 64 units over the span of 5 months. < Back Petco Park Suite Renovations Over the span of 5 months, the two-phase Petco Park baseball suite renovations of 64 units included branch power wiring and device relocation for new kitchen equipment and lighting fixture upgrades. Location San Diego, CA Build Partners Shawmut Design & Construction Carrier Johnson CULTURE Size 33,500 sq.ft. 1/1 Previous Next

  • Leadership

    < Our Team Michelle Kirkwood Chairwoman of the Board Michelle Kirkwood began her career at A.J. Kirkwood in 2001 as Corporate Relations Director. She has also served on the Board of Directors since 2008. Mrs. Kirkwood is extremely proud of her A.J. Kirkwood & Associates family.

  • Orange County Museum of Art | Electrical Construction

    The Orange County Museum of Art is a stunning 53,000-square-foot art museum located in Costa Mesa, CA. < Back Orange County Museum of Art The Orange County Museum of Art is a stunning 53,000-square-foot art museum located in Costa Mesa, CA. Within this new facility, there are 25,000 square feet dedicated to exhibition galleries, and an additional 10,000 square feet have been allocated for education programs, performances, and public gatherings. This expansion serves to greatly enhance access to OCMA's permanent collection, which features significant works of modern and contemporary art from Southern California and the Pacific Rim, in addition to their renowned special exhibition program. The installation of the electrical system was handled by AJK, which encompasses power and lighting, fire alarm, DAS, and VESDA systems, ensuring a state-of-the-art infrastructure to support the museum's mission. Location Costa Mesa, CA Build Partners Clark Construction mOrphosis Size 53,000 sq. ft Photos courtesy of Clark Construction 1/7 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Performing Arts Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Current Projects | Electrical Construction

    < Back 11800 Jefferson Previous Next

  • MonteCedro Phase II | Electrical Construction

    The MonteCedro Phase II project in Altadena marks the final phase of a thoughtfully designed master plan by Episcopal Communities & Services. < Back MonteCedro Phase II The MonteCedro Phase II project in Altadena marks the final phase of a thoughtfully designed master plan by Episcopal Communities & Services. This significant expansion brings four new villa-style residential buildings to the existing senior living campus, adding 40 independent living apartments to meet increasing demand. Designed with comfort and community in mind, the two- and three-story structures are arranged around a central event lawn and enhanced by vibrant outdoor features including a putting green, casual gathering areas, a pet park, and resident gardens. Two of the villa buildings sit atop a below-grade parking garage podium, which also houses a fully accessible auditorium at the southern end of the property, offering a flexible space for events and programs that serve the entire campus. The development also introduces a new terrace restaurant and completes approximately 10,000 square feet of interior renovations to Phase 1, updating key public and amenity spaces on the ground floor to align with the evolving needs of residents. All four new buildings will be licensed as Retirement Care Facilities for the Elderly (RCFE), and each condo is designed to support residents in aging in place, with services they can access as their needs change over time. AJK is providing comprehensive electrical systems for the project, including power and lighting, fire alarm, CCTV, security, voice/data, distributed antenna systems (DAS), 2-way communication, nurse call system, and audiovisual components—ensuring the safety, connectivity, and functionality that support modern senior living. MonteCedro’s final phase reflects a forward-thinking approach to community living for older adults, combining high-quality residential design with integrated wellness, social, and technological infrastructure. Location Altadena, CA Build Partners C.W. Driver Perkins Eastman Size 101,862 sq. ft. https://www.youtube.com/watch?v=6aQR4iWaaV0 https://www.youtube.com/watch?v=6fcrhgD5IhY MonteCedro Expansion.jpg MonteCedro Expansion.jpg 1/3 Previous Next

  • The Guild Hotel | Electrical Construction

    The 92,000 SF hotel features a lobby bar, outdoor restaurant, outdoor gardens, a private penthouse with a rooftop deck, and a grand ballroom that was once the gymnasium. < Back The Guild Hotel The Guild Hotel is a complete interior remodel of the existing 1920’s Army-Navy “YMCA” Youths Club Building which originally consisted of 259 dormitories with shared restrooms, transformed into a 163-guest-room hotel. The 92,000 SF hotel features a lobby bar, outdoor restaurant, outdoor gardens, a private penthouse with a rooftop deck, and a grand ballroom that was once the gymnasium. Location San Diego, CA Build Partners Davis/Reed Construction Joseph Wong Design Associates Size 91,240 sq. ft. 1/1 Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page