top of page

Search Results

Search this site

252 results found with an empty search

  • Petersen Automotive Museum | Electrical Construction

    The Petersen Automotive Museum project was a massive exterior and interior renovation to the existing iconic automobile museum. < Back Petersen Automotive Museum The Petersen Automotive Museum project was a massive exterior and interior renovation to the existing iconic automobile museum. The renovation included state-of-the-art lighting to the existing 4-story car museum and 22 exhibits. Location Los Angeles, CA Build Partners Matt Construction House & Robertson Architects Size 300,000 sq. ft. Delivery Method Design-Build 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back CSUF - Engineering & Computer Science Innovation Hub Previous Next

  • Leadership

    < Our Team Brad Hanenberg Senior Vice President of Strategy & Planning Brad started with AJK in 2007 after spending several years in the field and obtaining his Electrical Journeyman’s license. During his tenure, he has managed a variety of projects ranging in complexity, including design/build, high-rise construction, tenant improvements, museums, and historical restorations. He currently operates as the Company’s Senior Vice President of Strategy and Planning, managing risk through prefabrication and construction standardization.

  • Coresite Data Center | Electrical Construction

    The data center's special features include air-side economization, 95%-efficient UPS units in a 2N configuration, and the latest in energy-efficient technologies. < Back Coresite Data Center The project was built to LEED Gold certification standards and included the installation of (5) 2,000KW standby generators and an 8,000KW UPS system, and all primary/secondary hi-voltage gear and generator equipment. The data center's special features include air-side economization, 95%-efficient UPS units in a 2N configuration, and the latest in energy-efficient technologies. Location Santa Clara, CA Build Partners Matt Construction Teng & Associates Size 48,000 sq. ft. Photo #1 Courtesy of Nathaniel Riley 1/20 Previous Next

  • Current Projects | Electrical Construction

    < Back LCAD North Campus Innovation Center Previous Next

  • Hollywood Bowl | Electrical Construction

    The Hollywood Bowl lighting upgrades multi-phased project that included lighting upgrads, integration of Wifi, and renovation of the existing box office and plaza, enlarge 2nd Fl. picnic area, new elevators, & integrated bowl store/concessions, and replacement of House Lights direct to the owner. < Back Hollywood Bowl The Hollywood Bowl lighting upgrades multi-phased project included lighting upgrades throughout the venue for the first phase. The second phase was the integration of Wifi through the venue to improve event experiences for guests. For the first time in twenty years, the box office was renovated and additional pre-function space was installed to create more open space for visitors, a store to feature merchandise and souvenirs, and a market where snacks and beverages could be purchased. The last phase included the replacement of house lights direct to the owner. Location Hollywood, CA Build Partners Matt Construction Rios Clementi Hale Studios Photo Courtsey of LA Phil Association 1/1 Previous Next

  • CSUSB - Palm Desert Student Success Center | Electrical Construction

    The new 48,000 gross square foot Student Success Center will consolidate and expand student success initiatives and support services. < Back CSUSB - Palm Desert Student Success Center The new CSU San Bernardino - Palm Desert Student Success Center is a two-story development that will serve as the cornerstone of the Palm Desert Campus Master Plan. Designed to protect students from desert winds while drawing them in with a striking 50-foot clock tower and shaded outdoor spaces, the building will be a vibrant hub for student services and campus life. Inside, students will have access to a wellness center, library resources, dining facilities, and multi-use gathering areas that support both academic and community events. There will also be a photovoltaic array onsite that produces 100% of the building’s energy, underscoring the university’s commitment to sustainability. AJK’s scope of work goes far beyond the walls of this one building. Our team will deliver the complete electrical package: power, lighting, fire alarm, ERRCS (emergency radio responder communication system), audio visual, access control, security, communications, and low-voltage systems. AJK will also be installing a new low-voltage backbone that will not only serve this facility but lay the groundwork for future campus expansion. In addition, AJK will be constructing a new medium-voltage loop that extends around the campus, strategically dropping service points for planned upgrades. Location Palm Desert, CA Build Partners C.W. Driver LPA Inc. Size 48,000 gross sq. ft. https://video.wixstatic.com/video/91cf8b_906b2224b34f400284bd211e3a0cc87c/1080p/mp4/file.mp4 1/8 Previous Next

  • CBU - West Chemistry Lab | Electrical Construction

    The construction of the new chemistry lab featured lab improvements, microbiology lab improvements, support rooms, restrooms, equipment, and fixtures. < Back CBU - West Chemistry Lab The James West Chemistry Lab at Cal Baptist University started with the demolition of classrooms, offices, restrooms, and finishes. The construction of the new chemistry lab featured lab improvements, microbiology lab improvements, support rooms, restrooms, equipment, and fixtures. Location Riverside, CA Build Partners Tovey/Schultz PCH Architects Size 5,580-sq. ft. Photo Courtesy of Tovey Schultz 1/1 Previous Next

  • UCI Phase 4B | Electrical Construction

    The UCI Phase 4B project comprises four 5-story buildings, accommodating a total of 295 student housing units, providing 1,072 beds for continuing undergraduate and transfer students. < Back UCI Phase 4B The UCI Phase 4B project comprises four 5-story wood-framed buildings, accommodating a total of 295 student housing units, providing 1,072 beds for continuing undergraduate and transfer students. Each building features essential amenities such as a central lobby, social lounge, study room, laundry facility, bike storage area, fifth-floor lounge, and communal courtyards. AJK undertook the responsibility for installing power, lighting, fire alarm, and DAS systems for the project. Additionally, each housing unit will be equipped with its own load center, and the project incorporates four electric rooms, one per building, with electrical capacities of 400A, 2500A, and (2) 2000A. Location Irvine, CA Build Partners Morley Construction KTGY Architecture + Planning Size 385,370 sq. ft. 1/1 Previous Next

  • The WALK | Electrical Construction

    The Walk – Norwalk is a new 13-acre mixed-use development that will bring together shopping, dining, entertainment, and residential living in a vibrant, walkable community. < Back The WALK The Walk – Norwalk is a new 13-acre mixed-use development that will bring together shopping, dining, entertainment, and residential living in a vibrant, walkable community. The project includes nearly 89,000 square feet of retail and restaurant space, more than 370 apartment homes including affordable housing, and inviting outdoor plazas and green spaces. Built with the future in mind, the development features all-electric residential buildings, rooftop solar systems, and pedestrian-first design, while thoughtfully preserving the site’s historic monuments and public art. Location Norwalk, CA Build Partners Modblt Modular Construction Assemblage Work 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back Barrington Plaza Previous Next

  • The Marisol | Electrical Construction

    The Marisol, a 214-unit senior living community with assisted living and memory care residences, is planned for Huntington Beach. < Back The Marisol The Marisol, a 214-unit senior living community with assisted living and memory care residences, is planned for Huntington Beach. It will include studio, one-bedroom, and two-bedroom residences, with floor plans ranging up to 1,400 square feet. The leasing office is expected to open in spring 2027, with occupancy beginning in 2028. The community will include multiple dining venues, a coffee and snack bar, community store, wellness lounge, pool and spa, beauty salon, golf simulator, wellness gym, art studio, craft studio, community room and three courtyards. The Marisol will also be in close proximity to off-site dining, entertainment, and shopping Location Huntington Beach, CA Build Partners W.E. O'Neil Construction Van Tilburg, Banvard & Soderbergh, AIA Size 281,000 sq. ft. 1/2 Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page