top of page

Search Results

Search this site

252 results found with an empty search

  • Current Projects | Electrical Construction

    < Back Pomona College - CGE & LIRH Previous Next

  • Caltech - Shapiro Lab & Offices | Electrical Construction

    The first floor of Spalding Laboratories to was reconfigured to adequately serve the program requirements of the incoming professor, Mikhail Shapiro, Assistant Professor of Chemical Engineering at the California Institute of Technology. < Back Caltech - Shapiro Lab & Offices The project reconfigured the first floor of Spalding Laboratories to adequately serve the program requirements of the incoming professor, Mikhail Shapiro, Assistant Professor of Chemical Engineering at the California Institute of Technology. The project consisted of a research lab, offices for faculty and students, and support area. Location Pasadena, CA Build Partners Matt Construction CO Architects Size 3,300-sq.ft. Delivery Method Design Build 1/1 Previous Next

  • Barrington Plaza | Electrical Construction

    Barrington Plaza is a 712-unit apartment community situated at the intersection of Wilshire Boulevard and Barrington Avenue in Brentwood. < Back Barrington Plaza Barrington Plaza is a 712-unit apartment community situated at the intersection of Wilshire Boulevard and Barrington Avenue in Brentwood. The property is currently undergoing a phased redevelopment of all three towers to comply with updated city fire and life safety requirements. As part of this process, the buildings will be stripped down to their concrete slabs and structural steel in preparation for reconstruction. Once completed, the revitalized community will feature nine-foot ceilings and floor-to-ceiling glass windows. The renovation aims to modernize the infrastructure, enhance energy efficiency, and meet updated code requirements while ensuring operational continuity for existing tenants. Location Los Angeles, CA Build Partners Matt Construction Gensler 1/4 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Healthcare Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • UCI - Mesa Court Community Center | Electrical Construction

    The new UCI - Mesa Court Community Center is a two-story expansion that will transform the existing community center into an all-electric hub that bridges Lower and Upper Mesa Court. < Back UCI - Mesa Court Community Center The new UCI - Mesa Court Community Center is a two-story expansion that will transform the existing community center into an all-electric hub that bridges Lower and Upper Mesa Court. The new facility will feature a dining hall with seating for over 200 indoors and 30 outdoors, as well as a multipurpose room, lobby, study spaces, offices, and an outdoor terrace. The design emphasizes connectivity, technology integration, and sustainability, providing 19,845 SF of space that supports academic, social, and wellness needs. Designed to support both in-person and hybrid engagement, the renovation will improve dining efficiency and create a vibrant, connected space that meets the evolving needs of the growing Mesa Court community. AJK’s scope of work includes electrical, fire alarm, tele/data, security and access control, video surveillance, cellular DAS, and intrusion detection systems. Location Irvine, CA Build Partners Hathaway Dinwiddie Co. Alvine Engineering Size 19,310 sq. ft. 1/1 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Current Projects Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • Charles Drew University - HPEB | Electrical Construction

    The Charles R. Drew University HPEB is a new, four-story, 60,000-square-foot facility designed to house the university's medical education program and offer interdisciplinary programming for all three CDU colleges.  < Back Charles Drew University - HPEB The Health Professions Education Building (HPEB) at Charles R. Drew University of Medicine and Science is a new, four-story, 60,000-square-foot facility designed to house the university's medical education program and offer interdisciplinary programming for all three CDU colleges. The new building will support the University’s mission to cultivate health professional leaders dedicated to social justice and universal access to quality health care. Once completed, the 100,000 gross square feet facility will feature classroom space, anatomy laboratories, and collaborative spaces to support CDU’s more than 240 medical students. AJK was responsible the installation of all power and electrical systems, and covering both the design and installation of Lutron lighting. Additionally, AJK established the infrastructure for specialized systems, including the fire alarm system, Emergency Radio Responder Communication System (ERRCS)/DAS, voice data, and access control. Location Los Angeles, CA Build Partners Turner Construction CO Architects Size 60,000 sq. ft. https://video.wixstatic.com/video/91cf8b_ce946bd3d5014260b6bdb9786e9beec4/1080p/mp4/file.mp4 1/20 Previous Next

  • OCC - Kinesiology & Athletics Complex | Electrical Construction

    The new athletics center features state-of-the-art modernized training facilities, instructional spaces, and labs for the school’s physical education, athletics, sports medicine, and kinesiology programs. < Back OCC - Kinesiology & Athletics Complex Built in two phases, the new Orange Coast College athletics center features state-of-the-art modernized training facilities, instructional spaces, and labs for the school’s physical education, athletics, sports medicine, and kinesiology programs. Comprised of three buildings, the initial stage included the construction of a 58,000-sq.ft. multi-use building with competition and instructional pool deck while phase 2 included the renovation of the existing 30,000-sq.ft structure that housed the men’s and women’s locker room and pool areas. Location Costa Mesa, CA Build Partners C.W. Driver Little Size 88,000 sq.ft. Photo Courtsey of Little Diversified Architectural Consulting 1/1 Previous Next

  • MonteCedro Phase II | Electrical Construction

    The MonteCedro Phase II project in Altadena marks the final phase of a thoughtfully designed master plan by Episcopal Communities & Services. < Back MonteCedro Phase II The MonteCedro Phase II project in Altadena marks the final phase of a thoughtfully designed master plan by Episcopal Communities & Services. This significant expansion brings four new villa-style residential buildings to the existing senior living campus, adding 40 independent living apartments to meet increasing demand. Designed with comfort and community in mind, the two- and three-story structures are arranged around a central event lawn and enhanced by vibrant outdoor features including a putting green, casual gathering areas, a pet park, and resident gardens. Two of the villa buildings sit atop a below-grade parking garage podium, which also houses a fully accessible auditorium at the southern end of the property, offering a flexible space for events and programs that serve the entire campus. The development also introduces a new terrace restaurant and completes approximately 10,000 square feet of interior renovations to Phase 1, updating key public and amenity spaces on the ground floor to align with the evolving needs of residents. All four new buildings will be licensed as Retirement Care Facilities for the Elderly (RCFE), and each condo is designed to support residents in aging in place, with services they can access as their needs change over time. AJK is providing comprehensive electrical systems for the project, including power and lighting, fire alarm, CCTV, security, voice/data, distributed antenna systems (DAS), 2-way communication, nurse call system, and audiovisual components—ensuring the safety, connectivity, and functionality that support modern senior living. MonteCedro’s final phase reflects a forward-thinking approach to community living for older adults, combining high-quality residential design with integrated wellness, social, and technological infrastructure. Location Altadena, CA Build Partners C.W. Driver Perkins Eastman Size 101,862 sq. ft. https://www.youtube.com/watch?v=6aQR4iWaaV0 https://www.youtube.com/watch?v=6fcrhgD5IhY MonteCedro Expansion.jpg MonteCedro Expansion.jpg 1/3 Previous Next

  • Portfolio | A.J. Kirkwood

    < Back Performing Arts Power in Numbers Programs Locations Volunteers Project Gallery Previous Next

  • 1500 Granville | Electrical Construction

    1500 Granville is a design-build, multi-family, mixed-use project featuring three 5-story buildings consisting of 154 living units, 15,000 SF of retail space, and two levels of below-grade parking totaling 131,500 SF. < Back 1500 Granville 1500 Granville is a design-build, multi-family, mixed-use development characterized by three 5-story buildings, collectively offering 154 living units. The project also incorporates 15,000 square feet of retail space and encompasses two levels of below-grade parking, totaling 131,500 square feet. Among its amenities are indoor and outdoor gathering spaces, co-working areas, a fitness center, a pool area, BBQ facilities, and multiple outdoor and courtyard recreation spaces. AJK's scope of work included the installation of lighting systems, power infrastructure, a fire alarm system, telecommunication and data networks, audiovisual systems, and Distributed Antenna Systems (DAS). Location Los Angeles, CA Builder Suffolk Construction Lorcan O'Herlihy Architects Size 313,000 sq. ft. Delivery Method Design-Build 1/3 Previous Next

  • Current Projects | Electrical Construction

    < Back Crossroads Center for the Performing Arts Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page