top of page

Search Results

Search this site

246 results found with an empty search

  • CSUF - Visual Arts Complex | Electrical Construction

    The CSUF Visual Arts Complex underwent a comprehensive 110,000-square-foot modernization aimed at revitalizing Buildings A, B, C, and D. < Back CSUF - Visual Arts Complex The California State University, Fullerton (CSUF) Visual Arts Complex underwent a comprehensive 110,000-square-foot modernization aimed at revitalizing Buildings A, B, C, and D. This extensive renovation addressed functional and building code deficiencies, resolved outdated programmatic elements, and significantly extended the facilities' life expectancy by an additional 50 years. Every aspect of the original structures was upgraded or replaced to support modern academic and creative needs. In addition, Building F was demolished to make way for a brand-new, two-story, 13,000-square-foot facility designed to house state-of-the-art technology and teaching spaces, enhancing the university’s ability to support contemporary arts education. AJK was responsible for the complete installation of electrical and power systems, lighting, fire alarm system, telecommunications, and low-voltage systems throughout the complex. The scope also included audiovisual infrastructure and access control, ensuring that the upgraded and new buildings are equipped with advanced, integrated systems to support a dynamic and flexible learning environment. Location Fullerton, CA Build Partners C.W. Driver HGA Size 110,000 sq. ft. Delivery Method Design-Assist Photos Courtesy of HGA 1/6 Previous Next

  • Pomona College - Rains Athletic Center | Electrical Construction

    The athletic and recreation center will include gymnasium spaces, fitness rooms, locker rooms, classrooms, and offices for coaches and administrative staff. < Back Pomona College - Rains Athletic Center The new Rains Athletic Center at Pomona College was built to be 15,000 sq. ft. larger than the existing building. The athletic and recreation center will include gymnasium spaces, fitness rooms, locker rooms, classrooms, and offices for coaches and administrative staff. AJK installed power, lighting, and fire alarm. Location Pomona, CA Build Partners C.W. Driver SCB Architects, Inc. Size 25,590 sq. ft. renovation (1-story) 74,335 sq. ft. new construction (2-story) 1/4 Previous Next

  • 18722 Sherman Way | Electrical Construction

    18722 Sherman Way is a new construction modular development delivering 64 units of permanent supportive housing in the Reseda neighborhood of the City of Los Angeles. < Back 18722 Sherman Way 18722 Sherman Way is a new construction modular development delivering 64 units of permanent supportive housing in the Reseda neighborhood of the City of Los Angeles. The project includes 63 studio units designated for chronically homeless and homeless individuals, along with one two-bedroom manager’s unit. The building is designed with three residential stories constructed above a ground floor dedicated to supportive services and community programming. AJK is responsible for the complete electrical scope of work, including power distribution, nLight lighting control systems, fire alarm systems, public safety distributed antenna system (DAS) for emergency response, voice and data infrastructure, structured cabling, and access control systems. Location Los Angeles, CA Build Partners Suffolk Construction KFA Architecture Size 30,000 sq. ft. lot Awards 2025 Cal/OSHA Golden Gate https://video.wixstatic.com/video/91cf8b_64902d1068664ec8a981ba8c7c7ee2f4/1080p/mp4/file.mp4 1/1 Previous Next

  • Marriott Marina Del Rey Dual Hotel | Electrical Construction

    The ground-up construction of the dual-brand waterfront hotel by Marriott includes a Courtyard and Residence Inn includes two podium-type buildings with 288 guest rooms in total. < Back Marriott Marina Del Rey Dual Hotel The ground-up construction of the dual-brand waterfront hotel by Marriott includes a Courtyard and Residence Inn includes two podium-type buildings with 288 guest rooms in total. The hotel caters to the needs of both business travelers at the Courtyard and extended-stay guests at the Residence Inn visiting Marina del Rey. Both buildings share a lobby, waterfront restaurant and bar, and a second-level outdoor terrace showcasing the outdoor amenities including a pool, cabanas, and fireplace. The property also features a separate fitness building, a 72,000 sq. ft. subterranean parking structure, and a 28-foot-wide pedestrian promenade along the water with a new public dock service. AJK installed the power, lighting, and fire alarm system for this project. Location Marina Del Rey, CA Build Partners R.D. Olson Awbrey Cook Rogers McGill Architects Size 242,600 sq. ft. Delivery Method Design-Build 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back LCAD North Campus Innovation Center Previous Next

  • Current Projects | Electrical Construction

    < Back Edwards Lifesciences Entry Fountain Previous Next

  • Current Projects | Electrical Construction

    < Back Crossroads Center for the Performing Arts Previous Next

  • Current Projects | Electrical Construction

    < Back The WALK - Affordable Residential Housing Previous Next

  • 200 Mesnager | Electrical Construction

    200 Mesnager is a transformative mixed-use development that bridges Los Angeles’ industrial past with its urban residential future. < Back 200 Mesnager Located in the heart of the evolving Cornfield Arroyo district of Chinatown, 200 Mesnager is a transformative mixed-use development that bridges Los Angeles’ industrial past with its urban residential future. The 384,200-square-foot project consists of four wood-frame residential buildings (Type III) atop a concrete podium (Type I), creating a dynamic blend of residential, commercial, and public space. 200 Mesnager features 280 thoughtfully designed residential units and approximately 22,000 square feet of commercial space—blending street-level retail with creative office use. Amenities include a fitness center with a yoga studio, dog park, fire pit, BBQ area, housing support services, and a second-level pool deck. At its core, the project offers a publicly accessible open-air courtyard highlighted by a striking stainless-steel cable oculus—designed to serve as a vibrant community gathering space in a neighborhood on the rise. The development includes two levels of subterranean parking with 300 stalls for cars and motorcycles, supporting both residents and commercial tenants. AJK was responsible for the complete electrical scope of the project, including all power, lighting, and electrical distribution systems. Our team also installed the fire alarm and Distributed Antenna System (DAS), ensuring reliable communication and safety infrastructure throughout the site. Location Los Angeles, CA Build Partners Morley Builders GBD Architects Size 384,200 sq. ft. Photos Courtesy of parkeastla.com 1/9 Previous Next

  • Current Projects | Electrical Construction

    < Back Spotlight 29 Hotel Previous Next

  • CSUDH - Center for Science & Innovation | Electrical Construction

    The Center for Science & Innovation Building in STEM Education houses new teaching and research laboratory spaces for the physics, biology, and chemistry programs. < Back CSUDH - Center for Science & Innovation Designed to LEED Gold standards, this 90,000-sq.ft. Center for Science & Innovation Building in STEM Education houses new teaching and research laboratory spaces for the physics, biology, and chemistry programs. Located on the first floor, is the school’s new maker space fabrication laboratory. To accommodate the school’s science and technology needs, each space is designed with medium and low-voltage electrical systems, data ports, and substantial audio-visual features. Location Carson, CA Build Partners C.W. Driver Size 108,000 sq. ft. Delivery Method Design Assist 1/7 Previous Next

  • Leadership

    < Our Team Henry Gutierrez Executive Vice President Henry started as an electrical apprentice at ABC in 1998 and earned a Foreman title by the time he graduated in 2002. He ran projects for 10+ years before transitioning into the office as a Project Manager in 2012. With his work ethic and proficiency as a leader, he transitioned from PM to Sr. PM, then to Sponsor/Operations Manager, Senior Vice President, and currently Executive Vice President. His project experience ranges from Mixed-Use to Higher Education and everything in between. As an Executive Vice President, Henry oversees the Field Development of our company while maintaining his Sponsor/Operations Manager commitments.

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page