top of page

Search Results

Search this site

252 results found with an empty search

  • Current Projects | Electrical Construction

    < Back LCAD North Campus Innovation Center Previous Next

  • Hollywood Bowl | Electrical Construction

    The Hollywood Bowl lighting upgrades multi-phased project that included lighting upgrads, integration of Wifi, and renovation of the existing box office and plaza, enlarge 2nd Fl. picnic area, new elevators, & integrated bowl store/concessions, and replacement of House Lights direct to the owner. < Back Hollywood Bowl The Hollywood Bowl lighting upgrades multi-phased project included lighting upgrades throughout the venue for the first phase. The second phase was the integration of Wifi through the venue to improve event experiences for guests. For the first time in twenty years, the box office was renovated and additional pre-function space was installed to create more open space for visitors, a store to feature merchandise and souvenirs, and a market where snacks and beverages could be purchased. The last phase included the replacement of house lights direct to the owner. Location Hollywood, CA Build Partners Matt Construction Rios Clementi Hale Studios Photo Courtsey of LA Phil Association 1/1 Previous Next

  • CSUSB - Palm Desert Student Success Center | Electrical Construction

    The new 48,000 gross square foot Student Success Center will consolidate and expand student success initiatives and support services. < Back CSUSB - Palm Desert Student Success Center The new CSU San Bernardino - Palm Desert Student Success Center is a two-story development that will serve as the cornerstone of the Palm Desert Campus Master Plan. Designed to protect students from desert winds while drawing them in with a striking 50-foot clock tower and shaded outdoor spaces, the building will be a vibrant hub for student services and campus life. Inside, students will have access to a wellness center, library resources, dining facilities, and multi-use gathering areas that support both academic and community events. There will also be a photovoltaic array onsite that produces 100% of the building’s energy, underscoring the university’s commitment to sustainability. AJK’s scope of work goes far beyond the walls of this one building. Our team will deliver the complete electrical package: power, lighting, fire alarm, ERRCS (emergency radio responder communication system), audio visual, access control, security, communications, and low-voltage systems. AJK will also be installing a new low-voltage backbone that will not only serve this facility but lay the groundwork for future campus expansion. In addition, AJK will be constructing a new medium-voltage loop that extends around the campus, strategically dropping service points for planned upgrades. Location Palm Desert, CA Build Partners C.W. Driver LPA Inc. Size 48,000 gross sq. ft. https://video.wixstatic.com/video/91cf8b_906b2224b34f400284bd211e3a0cc87c/1080p/mp4/file.mp4 1/8 Previous Next

  • CBU - West Chemistry Lab | Electrical Construction

    The construction of the new chemistry lab featured lab improvements, microbiology lab improvements, support rooms, restrooms, equipment, and fixtures. < Back CBU - West Chemistry Lab The James West Chemistry Lab at Cal Baptist University started with the demolition of classrooms, offices, restrooms, and finishes. The construction of the new chemistry lab featured lab improvements, microbiology lab improvements, support rooms, restrooms, equipment, and fixtures. Location Riverside, CA Build Partners Tovey/Schultz PCH Architects Size 5,580-sq. ft. Photo Courtesy of Tovey Schultz 1/1 Previous Next

  • UCI Phase 4B | Electrical Construction

    The UCI Phase 4B project comprises four 5-story buildings, accommodating a total of 295 student housing units, providing 1,072 beds for continuing undergraduate and transfer students. < Back UCI Phase 4B The UCI Phase 4B project comprises four 5-story wood-framed buildings, accommodating a total of 295 student housing units, providing 1,072 beds for continuing undergraduate and transfer students. Each building features essential amenities such as a central lobby, social lounge, study room, laundry facility, bike storage area, fifth-floor lounge, and communal courtyards. AJK undertook the responsibility for installing power, lighting, fire alarm, and DAS systems for the project. Additionally, each housing unit will be equipped with its own load center, and the project incorporates four electric rooms, one per building, with electrical capacities of 400A, 2500A, and (2) 2000A. Location Irvine, CA Build Partners Morley Construction KTGY Architecture + Planning Size 385,370 sq. ft. 1/1 Previous Next

  • The WALK | Electrical Construction

    The Walk – Norwalk is a new 13-acre mixed-use development that will bring together shopping, dining, entertainment, and residential living in a vibrant, walkable community. < Back The WALK The Walk – Norwalk is a new 13-acre mixed-use development that will bring together shopping, dining, entertainment, and residential living in a vibrant, walkable community. The project includes nearly 89,000 square feet of retail and restaurant space, more than 370 apartment homes including affordable housing, and inviting outdoor plazas and green spaces. Built with the future in mind, the development features all-electric residential buildings, rooftop solar systems, and pedestrian-first design, while thoughtfully preserving the site’s historic monuments and public art. Location Norwalk, CA Build Partners Modblt Modular Construction Assemblage Work 1/1 Previous Next

  • Current Projects | Electrical Construction

    < Back Barrington Plaza Previous Next

  • The Marisol | Electrical Construction

    The Marisol, a 214-unit senior living community with assisted living and memory care residences, is planned for Huntington Beach. < Back The Marisol The Marisol, a 214-unit senior living community with assisted living and memory care residences, is planned for Huntington Beach. It will include studio, one-bedroom, and two-bedroom residences, with floor plans ranging up to 1,400 square feet. The leasing office is expected to open in spring 2027, with occupancy beginning in 2028. The community will include multiple dining venues, a coffee and snack bar, community store, wellness lounge, pool and spa, beauty salon, golf simulator, wellness gym, art studio, craft studio, community room and three courtyards. The Marisol will also be in close proximity to off-site dining, entertainment, and shopping Location Huntington Beach, CA Build Partners W.E. O'Neil Construction Van Tilburg, Banvard & Soderbergh, AIA Size 281,000 sq. ft. 1/2 Previous Next

  • GIVING BACK | A.J. Kirkwood

    GIVING BACK At A.J. Kirkwood & Associates, our commitment to people extends beyond the work we build. We support organizations that strengthen the communities we serve, focusing on long-term impact through consistent partnership and involvement. Our Approach We believe meaningful support comes from consistency. We focus on building relationships with organizations that are making a measurable difference, supporting their efforts over time, and staying engaged in the communities we’re part of. How We Support Our involvement includes a combination of financial support, event participation, and ongoing engagement throughout the year, reflecting our commitment to the people and communities behind the work. Our Community Partners CHOC Foundation We are proud to support CHOC Foundation and the work they do for pediatric patients and families across our community. Through our ongoing partnership, we contribute to efforts that expand access to care, strengthen critical programs, and provide support to those navigating some of life’s most challenging moments. CHOC Thanks AJK Caterina's Club We support Caterina’s Club in its mission to provide warm, nutritious meals to children in need. Their work addresses a fundamental need in our community, ensuring that families have consistent access to meals and support, both locally and beyond. Get Involved

  • Alloy | Electrical Construction

    Located in the Arts District in Los Angeles, Alloy is a mixed-use development. < Back Alloy Located in the Arts District in Los Angeles, Alloy is a mixed-use development. The development features a striking combination of a 6-story office tower and a 35-story residential tower, unified by a shared three-story podium. This podium is designed with versatility and efficiency in mind, incorporating three below-grade parking levels, two above-grade parking floors, and space for approximately 735 vehicle stalls. The ground floor is dedicated to mixed-use purposes, including 20,000 square feet of retail space, six live/work units, service areas, and building lobbies and leasing areas. The office tower spans approximately 105,000 square feet and offers a sleek, modern workspace. It includes a ground-floor lobby and shell and core office spaces on floors 2 through 6, with mechanical space situated on the roof. The residential tower boasts 475 units, with its own ground-floor lobby and leasing areas, and a dedicated third-floor amenity space. Residential units occupy floors 4 through 34, providing extensive living options and additional amenity areas. This project’s unique combination of residential, commercial, and retail spaces, along with substantial parking and amenity provisions, makes it a comprehensive and dynamic addition to the urban landscape. AJK installed the full electrical AJK was responsible for the complete installation of electrical and power systems, emergency generator and utility transformers, lighting, fire alarm system, smoke control, telecommunications, and low-voltage systems, public and cellular DAS, 2-way communication system, intercom, and security system throughout the complex. Location Los Angeles, CA Build Partners Carmel Solomon Cordell Buenz Size 1,032,000 sq. ft. Delivery Method Design-Build LEED Certification LEED Silver - Residential Tower LEED Gold - Office Building 1/1 Previous Next

  • The Guild Hotel | Electrical Construction

    The 92,000 SF hotel features a lobby bar, outdoor restaurant, outdoor gardens, a private penthouse with a rooftop deck, and a grand ballroom that was once the gymnasium. < Back The Guild Hotel The Guild Hotel is a complete interior remodel of the existing 1920’s Army-Navy “YMCA” Youths Club Building which originally consisted of 259 dormitories with shared restrooms, transformed into a 163-guest-room hotel. The 92,000 SF hotel features a lobby bar, outdoor restaurant, outdoor gardens, a private penthouse with a rooftop deck, and a grand ballroom that was once the gymnasium. Location San Diego, CA Build Partners Davis/Reed Construction Joseph Wong Design Associates Size 91,240 sq. ft. 1/1 Previous Next

  • Petco Park Suite Renovations | Electrical Construction

    The Petco Park Suite renovations included 64 units over the span of 5 months. < Back Petco Park Suite Renovations Over the span of 5 months, the two-phase Petco Park baseball suite renovations of 64 units included branch power wiring and device relocation for new kitchen equipment and lighting fixture upgrades. Location San Diego, CA Build Partners Shawmut Design & Construction Carrier Johnson CULTURE Size 33,500 sq.ft. 1/1 Previous Next

A.J. KIRKWOOD & ASSOCIATES, INC.

Grounded In Safety

4300 N. HARBOR BLVD.

FULLERTON, CA 92835

PHONE: (714) 505-1977

FAX: (714) 870-6991

LICENSE# 724633

bottom of page